05547-0798 <90-00047>

INSTALLATION

T
his chapter consists of five sections which install and set up
the 05547-01. These sections are: Equipment Mounting,
Wiring, Switch and Strap Settings, Turn-Up Procedure, and
Troubleshooting. Follow these sections in order. Following those
are sections on the 00331 Off-Net Interface and the 05723
Network Interface Shelf.
All switch, strap, and level settings are factory-set.
TOOLS REQUIRED:
Ohmmeter
Phillips screwdriver
To install the equipment assembly:
1.
Set the assembly on a flat surface.
2.
On the left side of the front panel of the assembly is a Phillips
screw. Turn the screw counterclockwise 90 degrees and open the
panel.
3.
Carefully remove the 46105, 44214, 44020, 44022, and 49920 mod-
ules. All options and levels have been factory-set.
4.
Visually inspect the shelf and modules for obvious damage.
5.
Close the front panel of the assembly.
6.
Use the ohmmeter to check for a short across the power input at
TB1-1 (negative battery) and TB1-3 (ground) on the rear of the top
(33337-00) equipment shelf. Refer to Fig. 2 for the location of TB1.
7.
Refer to Fig. 3 and install the unit in your equipment rack. Hard-
ware is supplied in a bag attached to the side of the assembly.
Fasten the assembly in the rack with three Phillips screws
and lockwashers - two on the right side, and one on the lower
left side.
Fasten the upper left corner of the assembly with one ESD
stud and lockwasher. Make sure the stud is properly
grounded to the frame rail.
Place an ESD label next to the ESD stud.
From the rear of the rack, install the other ESD stud and
lockwasher in the frame rail, ensuring proper grounding of
the stud.
Place an ESD label next to the ESD stud.