Nortel Multiservice Switch 7400 Installation & Maintenance page 12

Table of Contents

Advertisement

Multiservice Switch 7420 installation task flow
Multiservice
Switch 7420
installation
Installing a control
processor
Task flow navigation
Grounding a dc-powered Multiservice Switch 7420 (page 150)
Installing a Multiservice Switch 7420 into a rack or cabinet (page 198)
Installing a Multiservice Switch 7420 into a seismic rack or cabinet
(page 200)
Installing a 13-inch termination panel on a Multiservice Switch 7420
(page 160)
Installing a control processor (page 179)
Installing a desk-top mounted Multiservice Switch 7420 (page 191)
Installing an FP (page 246)
Copyright © 2005, Nortel
- 12 -
Multiservice Switch 7420 installation
Unpacking a
Multiservice
Switch 7420
Installing a
Installing a
Multiservice
Multiservice
Switch 7420 into a
Switch 7420 into a
seismic rack or
rack or cabinet
cabinet
Grounding a
Installing dc power
dc-powered
cables onto a
Multiservice
Multiservice
Switch 7420
Switch 7420
Installing an FP
Yes
Install
another FP?
Nortel Multiservice Switch 7400
Hardware Installation, Maintenance, and Upgrade
NN10600-175 7.1S1 Standard
PCR7.1 and up October 2005
Installing a 13"
termination panel
Select the
in a Multiservice
mounting
Switch 7420
option
(if necessary)
Installing a desk-
top mounted
Multiservice
Switch 7420
Installing ferrite
beads onto dc
power cables
(optional)
Powering up a
No
Multiservice
Switch 7420
Installing FP
cables
Installing a
vertical-mount
Multiservice
Switch 7420
End
PP_TASK_1010
Nortel Confidential

Advertisement

Table of Contents
loading

Table of Contents