Download Print this page

Eagle Peak GHT91-GRN-AZ Instruction Manual

Tunnel greenhouse 13 ft x 6.6 ft x 6.6 ft

Advertisement

Quick Links

INSTRUCTION MANUAL
EAGLE PEAK Tunnel Greenhouse 13 Ft x 6.6 Ft x 6.6 Ft
Thank you for choosing Eagle Peak !

Advertisement

loading
Need help?

Need help?

Do you have a question about the GHT91-GRN-AZ and is the answer not in the manual?

Questions and answers

Summary of Contents for Eagle Peak GHT91-GRN-AZ

  • Page 1 INSTRUCTION MANUAL EAGLE PEAK Tunnel Greenhouse 13 Ft x 6.6 Ft x 6.6 Ft Thank you for choosing Eagle Peak !
  • Page 2: Warranty

    WARRANTY For warranty, please DO NOT return your product or parts to the manufacturer without contacting EAGLE PEAK Customer Service, the purchaser must obtain prior authorization from EAGLE PEAK Customer Service. Our Customer Service will determine whether a return is required and may request pictures of the unit in place of a return.
  • Page 3: Before Assembly

    BEFORE ASSEMBLY · Please read and understand this manual before any assembly. Before the assembly of product, make sure all parts are included. Compare parts with above list. · If any part is missing, or if you have any questions, contact us through the website. ·...
  • Page 4: Package Includes

    PACKAGE INCLUDES ● Assemble the metal frame as shown in the below diagram. Part Part PE Top...
  • Page 5 SET UP THE TUNNEL FRAME Step 1 You will need: Part Part fig. 3 fig. 3 fig. 4 fig. 1 fig. 2 fig. 4 fig. 2 fig. 1 fig. 2...
  • Page 6 SET UP THE TUNNEL FRAME Step 2 You will need: Part Part fig. 7 fig. 6 fig. 5 fig. 7 fig. 7 fig. 5 fig. 6 fig. 5 fig. 5...
  • Page 7 SET UP THE TUNNEL FRAME Step 3 You will need: Part Part fig. 10 fig. 10 fig. 8 fig. 9 fig. 9 fig. 9 fig. 8 fig. 8...
  • Page 8 SET UP THE TUNNEL FRAME Step 4 You will need: Part Part fig. 14 fig. 14 fig. 12 fig. 13 fig. 13 fig. 13 fig. 12 fig. 11 fig. 11...
  • Page 9 SET UP THE TUNNEL FRAME Step 5 You will need: Part Part fig. 18 fig. 19 fig. 19 fig. 15 fig. 18 fig. 17 fig. 17 fig. 16 fig. 15 fig. 16 fig. 16...
  • Page 10 SET UP THE TUNNEL FRAME Step 6 You will need: Part ● Put the nut caps on nuts for screw protection purpose. Cover Each Nut...
  • Page 11 ATTACH THE PE TOP Step 7 You will need: Part PE Top ● Attach the PE top and secure the top to the frame using built-in ties.
  • Page 12 ROLL UP THE DOOR AND CURTAINS Step 8 ● Roll up the door and curtains if needed.
  • Page 13 SECURE THE TUNNEL FRAME Step 9 You will need: Part Part ● Attach the ropes on the top and insert stakes in the ground for better stability.
  • Page 14 SECURE THE TUNNEL FRAME Step 10 ● Put weights on the overlong cover to help weigh it down.