Procedures; Set Up - Novasub THETIS-C2 Operation Manual

Surface control case with digital two diver radio
Table of Contents

Advertisement

Procedures

Set up

When a case is used, place it on a flat surface that can support the unit. Select a working area which is secure, stable,
convenient, and suitable for use during the period of the dive.
Conduct a visual inspection of unit to insure no damage has occurred during transportation to the job site, or since the
last time the unit was used.
Connect an external power source if needed
Connect the Diver Umbilicals
Turn the system ON
Version: 1.2 - Date: 02-09-2022
SCC-2DR-DSP-L1.0 Manual
www.novasub.com
9 of 14

Advertisement

Table of Contents
loading

This manual is also suitable for:

Scc-2dr-dsp-l1.0

Table of Contents