T-35 Lectern Part Drawing Description Front Upright 1 EA Back Upright 1 EA Base 1 EA Shelf Support 1 EA Top Platform 1 EA Book Ledge 1 EA Hardware List Screw 13 EA Tools required: Wood Dowels 5 EA Phillips Head Screw...
T-35 Lecturn Assembly Diagram To Assemble: Separate and Identify 2 Beveled Ends all the Parts and Hardware. Together Place Front Upright (P-1) on the floor with 3 holes facing up. Insert 2 each Dowels (B) in the 2 holes as shown in illustration #1.
Page 4
Dowel Hole Insert Dowel (B) into Hole in the end of Back Upright (P-2). Align Shelf Support (P-4) to the Front and Back Uprights (P-1 & P-2) and secure using 3 each Screws (A) as shown in illustration # 3. Insert 2 each Dowels (B) into the holes in the Shelf Support (P-4)as shown in illustration # 4.
Page 5
T-35 Lecturn For more information 1-800-256-PEWS 44¼” 41” Shipping Information 15½” 1.4 Cubic Feet 15½” 15 lbs. 2¼” 47¾” 19½ 09/09/02...
Need help?
Do you have a question about the T-35 and is the answer not in the manual?
Questions and answers