682R Reservoir API 682 Compliant Reservoirs
8 Maintenance
8.1 General guidelines
Periodic maintenance must be done at regular intervals
(weekly, monthly, yearly). Refer to the following tables.
All liabilities and warranties to Flowserve for damage
incurred using non-original replacement parts and
accessories will be rendered null and void.
8.2 Periodic maintenance tables
Use the following tables to plan the periodic maintenance
for your system (refer to the table of contents and the
Appendix for the relevant information)
Table 3 - Periodic Maintenance Tables
Weekly maintenance
Check the seal, 682R Reservoir, and interconnecting pipe work for leaks. Rectify if necessary.
Check if the 682R Reservoir is not vibrating.
Check the fluid pressure, flow and temperature.
Monthly maintenance
Confirm Reservoir installation.
Check the fluid for impurities.
Vent the 682R Reservoir interconnecting pipelines as needed.
SSIOM000743-00 (EN/AQ) November 2022
Flowserve.com 21