Safety Instructions - QEED QC-POWER-T-TA User Manual

Three-phase network analyser
Table of Contents

Advertisement

Available languages

Available languages

QC-POWER-T-TA
and up to 90A true root mean square measurements (TRMS). A serial output RS-485
During the installation and operation of the device, observe the following
instructions:
1) The device must be installed by a qualified person
2) The device must be installed in an electrical panel which, after installation,
leaves terminals inaccessible
3) The electrical system in the building where the device is installed must
feature a switch or circuit breaker: this must be near the device and in a
position that can be easily reached by operators
4) A protection device against over-currents must be installed in the electrical
system, upstream of the instrument
5) Connect the device as shown in the diagrams of this manual
6) Before making contact with terminals, ensure that conductors to be
connected to the device are not live
7) Do not power or connect the device if any part of it is damaged.
NOTE: Network analyzer QC-POWER-T-TA is aimed for use in places with over-
voltage category III and pollution degree, 2 as per EN 61010-1
User Manual
THREE-PHASE NETWORK ANALYSER
Read all the instructions carefully

SAFETY INSTRUCTIONS

- 22 -
User Manual - QC-POWER-T-TA

Advertisement

Table of Contents
loading

Table of Contents