KYOWA BLW-A Instruction Manual

Hollowed load cell

Advertisement

Quick Links

BLW-A HOLLOWED LOAD CELL INSTRUCTION MANUAL
Thank you for purchasing BLW-A hollowed load cell. Before using
it, please read this instruction manual carefully. Also, keep the
manual within easy reach so that you can refer to it whenever
necessary.
1. Installation
1.1 The load cell is delivered with its load receiving upper and lower
surfaces coated with rust preventive paint. Before installing the
load cell, be sure to remove these coats using toluene or
acetone. If not, the coats will adversely affect the load cell's
characteristics.
For caution's sake, the load receiving upper and lower surfaces
have undergone grinding to ensure the high Load Cell's
characteristics. Take care to keep the surfaces from damage.
Also be sure to form a protective coat of machine oil as rust
preventive paint on the loading surface each time the load cell
is set aside for after use.
1.2 The load cell is designed to detect a load affected on an
anchor. Set the load cell to the center of an anchor with care
not to have dust, sand, gravel particles trapped between the
load cell and the bearing plate.
When installing the load cell to a slant, take care that the
anchor will come to the center of the load cell by inserting
styrene foam or the like between the inside of the load cell and
the anchor.
1.3 The quality of load cell installation directly affects measurement
accuracy. Therefore, in order to avoid an aslant load or an
eccentric load, pay attention to the position and size of the load
cell installation, as possible.
1.4 Using a styrene foam plate or other, shade the load cell from
the direct rays of the sun.
1.5 In order to keep the load cell cable from deformation by
external forces and avoid external noise, take care to place it in
a steel pipe, etc. as much as possible.
1.6 Connect the load cell to a tester, and measure an insulation
resistance value.
1.7 Connect the load cell to an indicator, and measure an initial
unbalance value.
2. Handling Precautions
2.1 Check that the load cell's manufacturing number agrees with the
test data sheet.
2.2 Check that the load cell's insulation resistance is 100M Ω or higher
between the main body and red to green of the cable. To measure
insulation resistance, apply a voltage lower than 50V to the
insulation resistance tester.
2.3 Using the tester, check that the load cell's input / output resistance
are as follows.
Input resistance (between red and black wires) : approx. 350Ω
Output resistance (between white and green wires) : approx.350Ω
2.4 Avoid hitting or the other shocks on the load cell, or disconnection or
damage may occur. If shocks should be given to the load cell, its
performance stability may be adversely affected in long-term
continuous operation.
2.5 For transit, keep the load cell in its case. If it is carried by holding
the cable only, the cable may be damaged to cause disconnection
and / or deterioration of the insulation resistance. Measurement
may thus become impossible.
2.6 Do not disassemble the load cell.
2.7 Be sure to put the accessory cable cap on the end of the cable, and
to avoid water on the conductors.
2.8 Do not bend the cable extremely. Do not drop matters on it or tread
on it. (Keep the radius of curvature larger than 10cm when bending
the cable)
Fig.1 Installation for VSL stressbar anchor
IM-T-248b '08.11

Advertisement

loading
Need help?

Need help?

Do you have a question about the BLW-A and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for KYOWA BLW-A

  • Page 1 IM-T-248b '08.11 BLW-A HOLLOWED LOAD CELL INSTRUCTION MANUAL Thank you for purchasing BLW-A hollowed load cell. Before using 1.6 Connect the load cell to a tester, and measure an insulation it, please read this instruction manual carefully. Also, keep the resistance value.
  • Page 2 * For grounding of lightning arrester kit. Fig.5 Dimensional drawings Applicable Center Fig.2 Wiring Model Hole Diameter 3.2 Connections of the load cell’s input output cables with the BLW-A-500KN φ125 φ175 φ123 terminals of an indicator and with those of a scanner are BLW-A-1MN φ144 φ210...
  • Page 3 IM-T-248b '08.11 BLW-A センタホール型 荷重計 取扱説明書 このたびは BLW-A センタホール型荷重計をお買い上げ頂きま 1.5 荷重計のケーブルは、できるだけ鋼管等の配管中に収め外部 して、ありがとうございます。ご使用の前には本書を必ずお からの力による変形や外部ノイズの防止を図ってください。 読みください。また、お読みになった後は、いつでも見られ 1.6 荷重計をテスタにつないで絶縁抵抗値を測定してください。 るところに必ず保管してください。 1.7 荷重計を指示計につないで初期不平衡を測定してください。 1.取り付け 2.使用上の注意 1.1 荷重計の荷重を受ける上・下面にサビ止め塗装を施して 2.1 検査成績書と製造番号を照合してください。 あります。荷重計を設置するときにはトルエンまたはア 2.2 絶縁抵抗値を確認してください。 100MΩ以上/50V DC セトンを使用して取り除いてください。サビ止め塗装を 絶縁抵抗を測定する場合には、絶縁抵抗計の印加電圧は 50V したまま使用しますと、 特性に悪い影響をおよぼします。 以下で行ってください。 なお、荷重を受ける上・下面は特性向上のため研磨仕上 2.3 テスタで入出力抵抗をチェックしてください。 げになっておりますので、キズをつけぬように注意して...
  • Page 4 3.接続 5.外形寸法 3.1 配線は下記のようになっています。 ※ M4 深5 ※耐雷接続キットのアース接続用 図 2 配 線 図 4 外形寸法 3.2 荷重計ケーブルと指示計及びスキャナーの端子の接続を 型式名 適用センタホール径 以下に示します。指示計及びスキャナーの端子には、 BLW-A-500KN φ125 φ175 φ123 以下 A,B,C,D の表示と R,W,B,G の表示のものがあります。 BLW-A-1MN φ144 φ210 φ142 以下 ①A,B,C,D の場合 BLW-A-1500KN φ155 φ250 φ153 以下...

This manual is also suitable for:

Blw-a-50qknBlw-a-1mnBlw-a-150qknBlw-a-2mn