Download Print this page

Inax NYSA-1-R-SET(WR)/FW1 Installation Instructions Manual

Body hug shower

Advertisement

Quick Links

BODY HUG SHOWER
NYSA -1-R-SET(WR)/FW1
NYSA -1-R-SET(WR)/N11
Installation Instructions
■Contents
1. Product Structure ...................................................................... p.2
2. Names and Features of Parts .................................................... p.2
3. Material Packing Slip ................................................................. p.3
4. Required Tools ........................................................................... p.5
5. Confirmation of the mounting position ................................... p.6
6. Mounting method ..................................................................... p.7
7. Inspection after installation ...................................................... P. 17
8. Reference information ...............................................................P. 18

Advertisement

loading

Summary of Contents for Inax NYSA-1-R-SET(WR)/FW1

  • Page 1: Table Of Contents

    BODY HUG SHOWER NYSA -1-R-SET(WR)/FW1 NYSA -1-R-SET(WR)/N11 Installation Instructions ■Contents 1. Product Structure ..............p.2 2. Names and Features of Parts ............ p.2 3. Material Packing Slip ..............p.3 4. Required Tools ................p.5 5. Confirmation of the mounting position ........p.6 6.
  • Page 2: Product Structure

    1. Product Structure ■The hose that attaches to a faucet is connected to the right side of the product main body. 2.Names and Features of Parts •The arm can be pulled out toward the front about the rotation axis. (Left and right independent) •...
  • Page 3 3.Parts packing slip Open the package and check if there are any parts or not. ■Body Hug Shower main body: (White) NYSA-1-R/FW1 (Black) NYSA-1-R/N11 Main body Mirror frame Mirror frame upper cover Name Shape Quantity Name Truss Head Screw (M4 x 8) Low Head Screw (M4 x 8) Upset Bolt (M5 x 10) silicon tube Shape...
  • Page 4 ■Mirror: KGM -2579S Name Mirror adjusting spacer Shape Quantity ■Connecting Hose Set <Metal style> L=600:A-11239-6-PU Name connecting hose Connecting Elbows Shape Quantity ■Others Usage Label Name Instruction manual Usage Label Shape Quantity -4 -...
  • Page 5: Required Tools

    4.Required tool electric screwdriver + Screwdriver (#2 ) sealing gun horizontalizer Driver Bit (# 2) - Driver. Electric Drill Blade (Φ 6) Carbide Drill for Porcelain Tiles (Φ6 ・Φ 4.5) Do not use impact drivers. Spanner water pump Plastic Monkey Wrench (For Opposite Side pliers Hammer...
  • Page 6: Confirmation Of The Mounting Position

    5.Confirmation of the mounting position •In order to install the BODY HUG SHOWER, it is necessary to provide a space of 20 mm in the upward direction (sliding when the main body is mounted) and 50 mm in the downward direction (connecting hose arrangement,and to prevent interference with faucet handle ).
  • Page 7: Mounting Method

    6.Mounting method •outline of the installation procedure ⑤ Attaching the mirror frame P. 15 ④ Assembly of mirror frame P.14〜15 ① Back Hanger Mounting ③ Mounting of the body P.13 〜14 ② Attaching the connecting elbow P. 12 ⑥ Mounting of Connecting Hose and Shower Hose P.
  • Page 8 Introduction (Back Hanger Mounting Method) The back hanger of the BODY HUG SHOWER is fixed by driving a tapping screw into the curl plug. Follow the instructions below to install the product. ■About Tap Drilling The back hanger is temporarily fixed to a Depth Approx.
  • Page 9 Installing the Back Hanger ※ 2 Back Hanger ① Temporarily fix the back hanger Φ4 mm Tras tappin x25mm Screw Horizontal Hook the daruma leveling hole part to the screw. ※3 Drive a screw into the oblong hole to make horizontal leveling.
  • Page 10 ② Perform pre-drilling at fixed positions (12 places) Point *Apply silicon to the plug at this timing for the When drilling is performed in the following daruma hole part/oblong hole part. procedure, the hole position are likely to be exact. Φ...
  • Page 11 When there is a level difference or warpage in ③ Attach the back hanger the mounting part of the back hanger. Φ4mm Tras tappin ① At a part where a gap is generated between x25mm Screw the back hanger and the wall surface due to the level difference of the surface of the tile or the warpage of the mounting surface, silicon is placed in a ball shape so as to fill the...
  • Page 12 Attaching the connecting elbow Check The body and mirror frame are packaged in a fitted state. Slide the mirror frame upward and remove it before mounting the body. ※1 ① Peel off the label and stick it on the underside of the arm. *To prevent incorrect installation when connecting the shower hose and connecting hose.
  • Page 13 body ※ 2 mounting of the body (Metal frame part) Upset bolts Φ5mm (with washers) X10mm Back hanger ① ② ※ 3 Tighten by hand . To ensure proper disengagement, check that the fixing holes are centered in the long holes. △Caution When engaging, do not engage by holding the arm part.
  • Page 14 Assembling the Mirror Frame Check When the joint ① Attach the mirror to the mirror frame between the body mirror frame and the back hanger is too tight Note the top and bottom ※Indicated on the reverse side. mirror mat ❶...
  • Page 15 ※1 Approx. ② Attach the mirror frame top cover 20mm Truss head Φ4mm screw X8mm mirror frame Tighten top cover by hand . body mirror frame Vertical section of joint ※When the fitting is tight, slide the mirror frame’s mirror lower part downward while pressing it against the frame main body.
  • Page 16 Mounting of connecting hose and shower hose Packing Bag nut plastic ※ (G 1/2) Tighten by hand . Connecting hose △Caution •When connecting to other manufacturers' faucets, the screw diameter may differ. In this case, use a conversion adapter. Packing •Do not tighten the bag nut at an angle.
  • Page 17: Inspection After Installation

    7.Inspection after installation Attaching the Usage Label Check the following items to confirm that the Before installation has been completed properly, and applying the hand it to the customer with the instruction label, ask the purchaser manual. whether to And if the usage label isn’t applied, hand it to the Shower apply a usage customer.
  • Page 18: Reference Information

    Reference Information 1. Hand shower installation •If the hand shower must be installed on the right side, install it as shown below. Standard Right Side 2. Connection of the main unit to the faucet by connecting hose •If the distance from the faucet to the main unit is too long for the supplied connecting hose(L=600mm) to reach, prepare a hose of suitable length with G1/2 connections and connect it properly.

This manual is also suitable for:

Nysa-1-r-set(wr)/n11