Trane BACnet MS/TP Installation, Operation And Maintenance Manual page 3

Wiring and link performance, best practices and troubleshooting
Table of Contents

Advertisement

Personal Protective Equipment (PPE) Required!
Failure to wear proper PPE for the job being undertaken could result in death or serious injury.
Technicians, in order to protect themselves from potential electrical, mechanical, and chemical
hazards, MUST follow precautions in this manual and on the tags, stickers, and labels, as well
as the instructions below:
Follow EHS Policies!
Failure to follow instructions below could result in death or serious injury.
Copyright
This document and the information in it are the property of Trane, and may not be used or reproduced in
whole or in part without written permission. Trane reserves the right to revise this publication at any time,
and to make changes to its content without obligation to notify any person of such revision or change.
Trademarks
All trademarks referenced in this document are the trademarks of their respective owners.
Revision History
BAS-SVX51L-EN
Before installing/servicing this unit, technicians MUST put on all PPE required for the work
being undertaken (Examples; cut resistant gloves/sleeves, butyl gloves, safety glasses, hard
hat/bump cap, fall protection, electrical PPE and arc flash clothing). ALWAYS refer to
appropriate Safety Data Sheets (SDS) and OSHA guidelines for proper PPE.
When working with or around hazardous chemicals, ALWAYS refer to the appropriate SDS
and OSHA/GHS (Global Harmonized System of Classification and Labeling of Chemicals)
guidelines for information on allowable personal exposure levels, proper respiratory
protection and handling instructions.
If there is a risk of energized electrical contact, arc, or flash, technicians MUST put on all PPE
in accordance with OSHA, NFPA 70E, or other country-specific requirements for arc flash
protection, PRIOR to servicing the unit. NEVER PERFORM ANY SWITCHING,
DISCONNECTING, OR VOLTAGE TESTING WITHOUT PROPER ELECTRICAL PPE AND ARC
FLASH CLOTHING. ENSURE ELECTRICAL METERS AND EQUIPMENT ARE PROPERLY
RATED FOR INTENDED VOLTAGE.
All Trane personnel must follow the company's Environmental, Health and Safety (EHS)
policies when performing work such as hot work, electrical, fall protection, lockout/tagout,
refrigerant handling, etc. Where local regulations are more stringent than these policies,
those regulations supersede these policies.
Non-Trane personnel should always follow local regulations.
Updated Best Practices chapter.
Updated Trane SerialSpy Protocol Analyzer Software chapter.
®
Added Tracer
SC+ BACnet
WARNING
WARNING
®
Capture Help File section.
Introduction
3

Advertisement

Table of Contents
loading

Table of Contents