3
With CT Panel in position, align the holes on the CT
panel with the holes on L and R panels and mark the
6
location of the hole to be drilled using pencil/marker.
Align slots on CT Panel with temporary mounting points on L and R Panels.
Remove existing screws from Top Panel.
Once the hole has been marked
remove the CT Panel.