Download Print this page

ABB Infinity S Quick Start Manual page 12

Hide thumbs Also See for Infinity S:

Advertisement

QUICK START GUIDE
Specifications and ordering information are in the Infinity S Ordering Guide available at
External Surge Protective Device (SPD) is required on all AC inputs.
Equipment and subassembly ports:
1. are suitable for connection to intra-building or unexposed wiring or cabling;
2. can be connected to shielded intra-building cabling grounded at both ends.
Grounding / Bonding Network – Connect to an Isolated Ground Plane (Isolated Bonding Network) or an Integrated
Ground Plane (Mesh- Bonding Network or Common Bonding Network).
Installation Environment - Install in Network Telecommunication Facilities, OSP, or where NEC applies.
Battery return may be either Isolated DC return (DC-I) or Common DC return (DC-C).
These documents are available at
Document
Title
CC848815341
Galaxy Pulsar Plus Product Manual
Galaxy Millennium II Controller Users Guide (aka Basic Installation and User's Guide for the Millennium II
108994645
Controller) Infinity S Power System Brochure
CC848815325
Infinity NE Install Guide
Page 12
© 2021 ABB. All rights reserved.
abbpowerconversion.com
abbpowerconversion.com

Advertisement

loading

This manual is also suitable for:

Nes2448-23-ac1-ps4-dc1e-lvbd