Complete The Installation - Kohler K-1445 Installation Manual

Removable apron
Table of Contents

Advertisement

Available languages

Available languages

3. Complete the Installation

Secure Panel
Slip the bottom of the panel down into the channel groove.
Tilt the panel up and align the top of the panel with the bottom of the rim of the bath/whirlpool.
Carefully push the panel into position.
Thread the adjustment screws on the bracket assemblies out until the rubber bumpers touch the
bath wall. Then secure by tightening the hex nuts.
Ensure the panel is aligned with both the rim of the bath/whirlpool and the edges of the frame.
Adjust as needed.
Ensure the gaps between the ends of the panel and the frame are even top to bottom [1/8" (3 mm)
to 3/16" (5 mm)], and equal from side to side. If not, remove the panel and adjust the corner shims
as needed.
Finish the Installation
Using a flat-blade screwdriver, gently pry the bottom of the panel away from the frame. Set the
panel aside.
Install water-resistant wall material [1-1/2" (3.8 cm) maximum thickness] to complete the finished
wall.
Install flooring material [2" (5.1 cm) maximum thickness] to complete the finished floor.
Service
Using a flat-blade screwdriver, gently pry the bottom of the apron panel away from the apron
frame.
Kohler Co.
Panel
5
Channel
Finished
Floor
Subfloor
1023729-2-B

Advertisement

Table of Contents
loading

Table of Contents