TRANSPORTATION
INSPECTION
All units are packed with protective materials in order to safeguard the structure and the panels.
Customer is therefore required to exam the exterior package upon delivery.
Any damages shall be immediately notified in details on the carrier's delivery document, and shall report to HL
(Europe) Ltd. in writing.
TRANSPORT
To left and move the unit, please refer to
Appendix "B"
– Overall Dimension Diagram for details.
CAUTION: Do not stack the unit even if they are packed.
INSTALLATION
POSITIONING
The unit is designed to be installed both indoor and outdoor.
The following consideration should be taking into account when choose a suitable location
─Length and origin of hydraulic line;
─Length and origin of the power supply;
─Free flow of air in-take;
─Easy service access;
─Strong even surface.
CAUTION: Making sure the discharged air does NOT blow back into the inlet. In some case, vibration dampers
may be applied to minimize the vibration been transmitted to the lower level.
HYDRAULIC CONNECTIONS
CAUTION: The inlet and outlet connections are NOT interchangeable, they must be connected as instructed in the
overall dimension data
(see Appendix "B")
.
The following suggestions should be considered when connect to the application system:
─Use vibration-damping joints to prevent vibration transmission and allow thermal expansion;
─Apply a shutoff valves on both inlet and outlet;
─Apply a By-pass valve.
IMPORTANT:
─When connection is completed, check for any water leakages;
─Drain the system thoroughly, making sure there is no air in the water circuit as it may damage the pump.
4