Download Print this page

Frame Assembly - PROformance Hoops CV Series Installation & Owner's Instructions

Advertisement

FRAME ASSEMBLY

 
1. Connection C1: Align the rear holes in the Lower Arm
with the lower holes of the Wall Mount Frame. Attach
each side using one B3, two W1, one P1 and one N1.
Another plastic washer P1 should be attached to the
inside of the arm. Allow movement between parts. Do not
over-tighten.
2. Connection C2: Attach the upper extension arms and upper
mounting brackets to the frame. Each connection uses one
B2, two W1, one P1 and one N1. Allow movement between
parts. Do not over-tighten.
3. Connection C3: Attach the lower mounting bracket to the
frame. Each connection uses one B1, two W1 and one N1.
4. Connection C4: Insert the
bushing through the actuator yoke
and the indicator strip. Insert bolt
B5 through a W2, an upper and
lower bracket, the bushing with the
indicator and actuator, the lower
and upper brackets on the other
side, then finish with a W2 and N2.
5. Connection C5: Attach lower
mount of actuator assembly to the
lower extension arm. This
connection uses one B4, two W2,
two P2 and one N2. Do not over-
tighten.
Page 6

Advertisement

loading

This manual is also suitable for:

Wmcv54Wmcv60Wmcv72