1
2
16
INSTALL TOE KICK – DD24DC, DD24DP & DD24DD MODELS
Measure toe kick height. Where
the toe kick meets the bottom
of the tub is the recommended
cut-off point.
Carefully score toe kick at
desired height.
3
4
Snap excess + smooth edges.
Snap both end tabs.
Slide toe kick onto the mounting rails
and secure
Do not over tighten the screws.