Twine TS-1800 Site Preparation Manual

Hide thumbs Also See for TS-1800:

Advertisement

Quick Links

TS-1800 Site Preparation Guide
November, 2022
Revision 1.5
© 2022 Twine Solutions Ltd. All rights reserved.
This document and the information contained herein is CONFIDENTIAL to TWINE Solutions Ltd, and shall
not be used, published, disclosed, or disseminated outside TWINE in whole or in part without TWINE's
consent. This document contains TWINE trade secrets. Reverse engineering based on any of the
information in this document is prohibited.
This copyright notice does not imply publication of this document.
This document shall not be circulated in part or whole outside TWINE.

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the TS-1800 and is the answer not in the manual?

Questions and answers

Summary of Contents for Twine TS-1800

  • Page 1 This document and the information contained herein is CONFIDENTIAL to TWINE Solutions Ltd, and shall not be used, published, disclosed, or disseminated outside TWINE in whole or in part without TWINE’s consent. This document contains TWINE trade secrets. Reverse engineering based on any of the information in this document is prohibited.
  • Page 2: Table Of Contents

    Handling Waste ........................17 Customer Information ..................18 11.1 Customer Details ........................18 11.2 Site Preparation Checklist ....................19 Confidential TS-1800 Site Preparation Guide Page 2 Hatnufa 7, Kiryat Arie, Petach Tiqva, 4951025, Israel P.O. Box 3391 | +972 3 5589505/606 | twine-s.com...
  • Page 3 Contents 11.3 Customer Acknowledgement ..................20 Confidential TS-1800 Site Preparation Guide Page 3 Hatnufa 7, Kiryat Arie, Petach Tiqva, 4951025, Israel P.O. Box 3391 | +972 3 5589505/606 | twine-s.com...
  • Page 4: About This Guide

    About This Guide About This Guide The information and requirements provided in this document ensure proper installation and operation of the Twine TS-1800 Digital Thread & Yarn Dyeing system. The customer is responsible for: Preparing the site as described in this document.
  • Page 5: Terms And Abbreviations

    Celsius or Centigrade °F degrees Fahrenheit feet kilograms pounds TS-1800 Digital Thread Dyeing system Volts Alternating Current Confidential TS-1800 Site Preparation Guide Page 5 Hatnufa 7, Kiryat Arie, Petach Tiqva, 4951025, Israel P.O. Box 3391 | +972 3 5589505/606 | twine-s.com...
  • Page 6: Physical Description

    Physical Description Physical Description Overview The TS-1800 comprises a single stand-alone unit, as shown in the figure below. Figure 1: TS-1800 Digital Thread & Yarn Dying System Confidential TS-1800 Site Preparation Guide Page 6 Hatnufa 7, Kiryat Arie, Petach Tiqva, 4951025, Israel...
  • Page 7: Size And Weight

    Physical Description Size and Weight The TS-1800 has the following main dimensions and weight: Length (L) 2.0 meters (79 inches)  Width (W) 0.75 meters (30 inches)  Height (H) 1.45 meters (57 inches)  Weight 480 kg (1058 lb) ...
  • Page 8: Shipping And Delivery

    Shipping and Delivery Shipping and Delivery Shipping Pallet The approximate size and weight of the TS-1800 system when mounted on a pallet is as follows: Length (L) 2.25 meters (89 inches)  Width (W) 0.89 meters (35 inches)  Height (H) 1.74 meters (69 inches) ...
  • Page 9: Installation Area

    Installation Area General IMPORTANT! If the TS-1800 is going to be located in an area that is not on ground floor level, you must ensure that the area has sufficient capacity for the weight and physical dimensions of the machine.
  • Page 10: Floor Plan

    Installation Area Floor Plan A sample floor plan is shown below, with the TS-1800 placed in a likely operating area. The dimensions shown in the figure are minimum clearance requirements. Figure 3: Floor Plan Sample (not to scale) Confidential TS-1800 Site Preparation Guide...
  • Page 11: Electrical Requirements

    The customer is responsible for ensuring that all tasks described in this section are performed by qualified personnel. Power A stable, reliable source of power is necessary. Power to the TS-1800 is supplied via a standard wall socket. TS-1800 Power Rating Total power consumption is 3KW.
  • Page 12: Residual Current Or Earth Leakage Device

    Output power capacity 5000VA Nominal Output Voltage 240V Nominal Input Voltage 240V Output frequency 50/60 Hz. Confidential TS-1800 Site Preparation Guide Page 12 Hatnufa 7, Kiryat Arie, Petach Tiqva, 4951025, Israel P.O. Box 3391 | +972 3 5589505/606 | twine-s.com...
  • Page 13: Network

    Network Network Network Connections The TS-1800 should be placed in an area with access to a strong Wi-Fi signal and connected to the network via a LAN communication connection. Min. Internet Speed 40mb  Wi-Fi frequency should be 2.4GHz ...
  • Page 14: Environmental Conditions

    Environmental Conditions Environmental Conditions Temperature, Humidity and Altitude The environmental conditions for the TS-1800 must be maintained within the limits detailed in the table below. Parameter Specification Operating temperature 10°C to 30°C (50°F to 86°F) Non-operating temperature 5°C and 50°C (41°F and 122°F)
  • Page 15: Accessories And Utilities

     Wi-Fi connection  Color Selection tools To dye a new color, the TS-1800 must receive a color input in the L*a*b* format This color format can be extracted from a fabric/yarn sample using a spectrophotometer. Examples for recommended spectrophotometers:...
  • Page 16 Standard Observer: CIE 1964 10  IMPORTANT! It is mandatory to have a spectrophotometer in hand for the installation. Please notify Twine in advance if you do not have one for the training. Confidential TS-1800 Site Preparation Guide Page 16 Hatnufa 7, Kiryat Arie, Petach Tiqva, 4951025, Israel P.O.
  • Page 17: Materials Handling & Storage

    Ink cartridges can be used only until the expiration date specified on the  cartridge. 10.2 Handling Waste All waste created by the TS-1800 is considered hazardous chemical waste and must be disposed of responsibly. There are 3 types of waste: Empty TDI ink cartridges 2.
  • Page 18: Customer Information

    Customer Information Customer Information Please fill in the information requested below and send it to your Twine representative. When your Twine representative approves your checklist, he will schedule the system installation. If you have any additional questions, please contact your Twine representative.
  • Page 19: Site Preparation Checklist

    8. Power plug 9. Communication line Wi-Fi (recommended) 11. Environmental conditions 12. Ventilation 13. Fire extinguisher Confidential TS-1800 Site Preparation Guide Page 19 Hatnufa 7, Kiryat Arie, Petach Tiqva, 4951025, Israel P.O. Box 3391 | +972 3 5589505/606 | twine-s.com...
  • Page 20 Twine, the undersigned will reimburse Twine for any such costs actually incurred by Twine.

Table of Contents