Power Management; Replacing The Dc Fuse; Using The Cooler At Home; Getting Started - GE PRV02 Owner's Manual & Installation Instructions

Electric cooler
Table of Contents

Advertisement

Available languages

Available languages

Power Management

voltage inputs.
DC Input
For optimum performance and efficiency, it is
important that the cooler has a reliable 15A
condition.
NOTE: When using a non-standard input
power supply, ensure that the peak
current output is greater
than 15A.

REPLACING THE DC FUSE

1. Remove the screw with a phillips screw driver.
2. Remove the fuse cover and defective
fuse.
3. Insert the new fuse. Make sure it is the
same type and rating (15A).
4. Replace the fuse cover.
NOTE: Style of plug may vary slightly.

USING THE COOLER AT HOME

1. Place the electric cooler at desired location.
4. Switch on the power button to the electric cooler.

Getting Started

SOME REMINDERS
1. Before use, keep the cooler in an upright position for 24 hours to ensure the cooler will
work properly.
2. Pre-Cool the unit to enhance system efficiency. Make sure the cooler is empty prior
to Pre-Cool.
8
12V or 24V
Fuse-link
Insulator
49-1000674 Rev. 4

Advertisement

Table of Contents
loading

This manual is also suitable for:

Prv03

Table of Contents