ABB NES48-19-4U-AC7-PS3-DIN15B250P-LVBD-ACSPD Quick Start Manual page 3

Din with integrated ac
Table of Contents

Advertisement

Quick Start Guide
Information: Breaker Location Diagram
Battery
One Shelf System
Step 5 - Connect Batteries - skip if no batteries installed
Install Battery Breaker Kits - skip if battery breakers are installed or batteries are not present
1. Connect alarm wire to battery breaker (wires provided).
Connect Fastons to breaker terminals.
Terminal 11 - Red
Terminal 12 - Black
2. Mount breaker to DIN rail.
a. Verify that breaker is OFF (handle down).
b. Fully open the screw connections at breaker
bottom - #2 Phillips
c. Slide breaker over bus tabs and engage top DIN rail fully
IMPORTANT - Verify top DIN rail engagement.
d. Tighten the breaker bottom connection - #2 Phillips
Page 3
© 2021 ABB. All rights reserved.
AC
Loads
Loads
Battery
Priority
Two Shelf System
3. Connect alarm wires to Alarm Card HDR3.
BAT1 Aux + Red
BAT1 Aux - Black
a. Run wires to HDR3.
b. Cut wires.
c. Strip 12 mm (1/2").
d. Push release lever, insert wire, release lever, Pull
wire to verify.
4. Repeat for additional Battery Breakers, BAT2, etc
Non-Priority
AC

Advertisement

Table of Contents
loading

Table of Contents