PBD-51041044
Fig. 25: Seal - Process fitting
1
Process seal
2
Rod seal
3
Hole for leakage detection
4 Process fitting, e.g. Clamp
8. Screw the process fitting by hand onto the thread of the sensor.
9. Tighten the process fitting with a suitable wrench with a torque of
20 Nm (14.75 lbf ft).
10. Screw the rod carefully by hand into the thread on the process
fitting.
11. Exert counterforce manually and tighten the rod on the flat sur-
faces with a torque of max. 4.5 Nm (3.32 lbf ft).
Information:
Please maintain the specified torque so that the max. tensile strength
of the connection remains.
9.8
Software update
The following components are required to update the sensor soft-
ware:
•
Sensor
•
Voltage supply
•
PC with PACTware
•
Current sensor software as file
SITRANS LG240 - Operating Instructions
1
2
3
4
63