Accord ™ Installation Guide EMEA APAC 2022 Guidelines for installing your new Accord™ combination board Doc # 100252 / Rev B | Page 1 of 10...
Page 2
English Safety Requirements Handling + Storing of Panels Required Materials + Equipment Installation Warranty For more languages go to https://polyvision.com/resources/installation/...
Safety Requirements Accord™ - Wall Mounted Combination Verify Wall Construction Board, Non-Seismic Applications CAUTION! Adequate wall construction is The building’s Engineer of Record must be required to support the weight of the board. consulted to determine if there are any Minimum wall construction must be capable seismic requirements.
Page 4
Protect panel surface against sawdust and sparks (metal particles). If you have a problem, question, or a request, call your local fabricator, your regional sales manager or Polyvision Customer Service. Polyvision’s global customer service team can be contacted on polyvision.com...
Anchors Weight 1780 mm 2 panels 21,8 kg 2425 mm 2 panels 32,5 kg 3015 mm 2 panels 42,2 kg Accord™ 1185 mm Horizontal 2375 mm 3 panels 23,9 kg 3020 mm 3 panels 34,6 kg 3610 mm 3 panels...
• Make sure all brackets are aligned and flush with the wall, use spacers if necessary. Accord™ vertical 1830 x 2375* *size for 2 Panel Configuration 1830 x 1780 22 cm 75,5cm 75,5cm Step 4: Apply the Adhesive foam as indicated on the drawing...
Page 7
Polyvision, at its option, will correct such nonconformity by repair or replacement. Correction in the manner provided above shall constitute a fulfillment of all liabilities of Polyvision with respect to the quality of the CeramicSteel. The warranty is applicable only under normal interior usage and maintenance and does not cover defects caused by improper handling, vandalism or abuse, or arising from failure to follow Polyvision’s instructions and recommendations...