anko MITYFLEX 907 Series Owner's Manual

anko MITYFLEX 907 Series Owner's Manual

Peristaltic pump

Advertisement

MITYFLEX
QUALITY MANAGEMENT SYSTEM REGISTERED 
TO ISO9001 INTERNATIONAL STANDARDS 
ANKO PRODUCTS INC. PUMP DIVISION
 
PERISTALTIC PUMP 
OWNERS MANUAL 
907 & 908 SERIES 
www.ankoproducts.com
 PERISTALTIC PUMPS 
 
 
 
 
 
 
 
 
 
 
 
 

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the MITYFLEX 907 Series and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for anko MITYFLEX 907 Series

  • Page 1 MITYFLEX  PERISTALTIC PUMPS    PERISTALTIC PUMP  OWNERS MANUAL    907 & 908 SERIES      QUALITY MANAGEMENT SYSTEM REGISTERED  TO ISO9001 INTERNATIONAL STANDARDS                  ANKO PRODUCTS INC. PUMP DIVISION www.ankoproducts.com 1   ...
  • Page 2: Table Of Contents

    Thank you for purchasing an Anko Mityflex  Peristaltic pump. We are sure you  ® will be completely satisfied with its performance. Should you need assistance or  have questions regarding the use or installation, please visit our website at  www.ankoproducts.com.      TABLE OF CONTENTS    WARRANTY  3  WARNING  3  RETURN AND REPAIR  3  PUMP FEATURES  4  PUMP INSTALLATION  4  FLOW CHARTS  5  ROLLER SELECTION  6  FUSE INSTALLATION/FAN ASSEMBLY  6  TUBING INSTALLATION  7  TUBING INSTALLATION PROCEDURE A  7  TUBING INSTALLATION PROCEDURE B  8  TUBING INSTALLATION PROCEDURE C  9  ROLLER BRACKET ASSEMBLY  10  ILLUSTRATION OF PUMP HEAD ASSEMBLY  11  REPLACEMENT PARTS LIST  11 ...
  • Page 3: Warranty

      LIMITED WARRANTY  ANKO PRODUCTS, INC., warrants equipment of its manufacture and bearing its identification  to be free from defects in workmanship and material. ANKO PRODUCTS, INC.’s liability under  this warranty extends for a period of one year from the date of delivery from our factory or  authorized distributor. It is limited to repairing or replacing any device or part of any device  which is returned, transportation prepaid, to the factory within one year of delivery to the  original purchaser, and which is proven to be defective upon examination by us. ANKO  PRODUCTS, INC. disclaims all liability for consequential damage of whatever nature, damage  of equipment during transportation, damage, damage due to improper handling, installation  or improper operation or for determining suitability for the particular use intended by a  purchaser. Replaceable parts including tubes supplied with the product are not covered by  any warranties either expressed or implied. ANKO PRODUCTS, INC., makes no warranties  either express or implied, including implied warranty or merchantability, other than those  stated above. No representative has authority to change or modify this warranty in any  respect. Jurisdiction and venue for enforcement of this warranty may be brought only in the  State of Florida. This warrant gives you specific legal rights, and you may also have other  rights which vary from state to state.    WARNING  ANKO PRODUCTS, INC. assumes no responsibility or liability for chemical compatibility of our  tubing in specific applications. ALWAYS pretest tubing in accordance with tubing  manufacturer’s specifications. Tubing that shows signs of swelling, embrittlement, or other  deterioration should not be used.     RETURN AND REPAIR REQUESTS  Please direct all warranty requests to the appropriate distributor the product was purchased  from.                       3   ...
  • Page 4: Pump Features

    The MITYFLEX ® 907 and 908 models are fixed speed general purpose pumps for dispensing  fluid based on products. The 907 is housed in a case and is controlled by a simple on/off  switch that activates the pump. The 908 is manufactured with a zinc plated steel bracket and  six inch lead wires for convenient assembly to your OEM application.    FEATURES  ELECTRICAL: 115 VAC, 60HZ; OPTIONS: 24 to 240 VAC; 50Hz, 60Hz, or 50/60Hz; 12 &  24 VDC. The 907 also includes; On/Off switch; 6 foot power cord.  PRIMING: Unit is self‐priming and will hold vacuum when off.  OPERATION: Pump can run dry without damaging the motor or drive unit, however the  tubing life will be reduced.  CONSTRUCTION: Polypropylene housing and case using stainless steel fasteners.  MAX. HEAD PRESSURE: Maximum working pressure 40 PSI.  MAX. SUCTION LIFT: 29 feet (8.8m) with H₂O.  RATING: AC Units‐ 100% of continuous operation at 25°C ambient; DC Units‐ 100%  continuous operation at 40°C ambient.  FLOW RATE: .4‐987 ml/min.  Depending on the tubing used. (See page 5).  FUSE: (907 only) Located on the exterior of the case. (See page 6 for replacement  procedure and page 5 for fuse type).     INSTALLATION INSTRUCTIONS  POWER REQUIREMENTS: Voltage and frequency of power supply must be the same as  shown on unit.  WIRING CONNECTIONS: All wiring and electrical connections must comply with local  and national electrical codes.  MOUNTING: (907) Case enclosed model has rubber feet and mounting flanges. This  enables it to be used on a flat surface or wall mounted. Be sure that one of the sets of  vent holes has plenty of air for circulation. (908) Mounting brackets for OEM  applications. Be sure there is plenty of space for air circulation. Do not allow tubing to  be crimped.   MOUNTING LOCATION: Pump should be placed in a dry location with adequate cooling  provided. The ambient temperature should not exceed 25°C for AC units or 40°C for  DC units..    WARNING  This unit should not be used in outdoor or hazardous locations.    4   ...
  • Page 5: Flow Charts

    MODEL 907 FLOW RANGE CHART  FLOW RATES (ml/min.)    FUSE/  FAN  Tubing  .062 In  .125 In  .187 In  .250 In    Fuse  Fan  ID   (1.6 m m)  93.2 m m)  (4.7 m m)  (6.3 m m)  Unit #                907‐002  .4  1.7  4  7    .5 amp    907‐007  1.5  5.9  14  25    .5 amp ...
  • Page 6: Roller Selection

    ROLLER/TUBING SELECTION  Use the following color coded rollers with the appropriate tubing I.D. Your unit is assembled  with black rollers. Red rollers are included in your tubing kit.  See separate instructions for  roller replacement enclosed in your tube kit.    Roller  Tubing ID  ML/Revolution  Black  1/4” (.250)  3.5  Black  3/16” (.187)  2.1  Red  1/8” (.125)  0.8  Red  1/16”*   0.21    *The 1/16”ID tubing must be inserted into 3/16” (.187) ID X 3/8” (.375) OD tubing (sleeve) for  operation in pump.    FUSE INSTALLATION (907)  (See page 4 for fuse type and page 10 for fuse ordering information)  Disconnect power to pump.  Remove four screws from case front.  Carefully remove case cover being sure not to pull wires apart.  Lay the unit on a flat surface.  Find fuse holder and pull apart.  Remove old fuse and replace with new fuse.  Replace case cover.    FAN ASSEMBLY  (See page 4 for replacement number)  Disconnect the power from the pump.  The fan is pressed on to the rotor shaft. On all 907 case units, the fan is pressed on with metal  clip away from the motor. On all OEM 908 units, the fan is pressed on with the metal clip  toward the door.   ...
  • Page 7: Tubing Installation

    TUBING INSTALLATION  Inspect all tubing regularly and replace if any sign of deterioration occurs. Always wear safety  glasses and protective clothing when working with chemicals. See chart below for proper  tubing installation procedure for your unit.  *90_‐002 through 90_‐014  Procedure A (below)    90_‐023 through 90_‐049  Procedure A or B (page 6 or 8)    90_‐058 through 90_‐282  Procedure A or C (page 6 or 9)  *WARNING: MODEL 907‐002, 907‐007, 907‐014, 908‐002, 908‐007 and 908‐014 GEARTRAINS  CAN BE DAMAGED IF DRIVE SHAFT IS ROTATED BY HAND FOR TUBE INSERTION.  PROCEDURE A    (If unit is new start with step # 6.)  Disconnect power to the pump.    Disconnect the suction and discharge    tubing from the pump tubing.  Remove four screws and pump cover    from pump head.  Pull out old pump tubing and discard.    Clean roller race, removing and    particles that could damage tubing.  Connect power and run at slowest    speed until roller bracket assembly is  in position as shown in figure 1.   Push new tubing into inlet port,    anchoring tubing in grippers. If using  a 9” piece of tube, 1 1/2” should be  extended outside of inlet port. (figure  2)  Continue to run at slowest speed    carefully feeding tube into race as the ...
  • Page 8: Tubing Installation Procedure B

      PROCEDURE B  Follow steps 1‐5 in procedure A, then    continue with the following.  Using extra bracket (figure 1), rotate    roller bracket assembly until it is in  position as in figure 2. (Be sure power  is disconnected).   Push new tubing into inlet port,    anchoring the tubing in grippers (see  figure 3). If using 9” piece of tube, 1  1/2” should be extended outside of  inlet port.  Continue to rotate the roller bracket    assembly using the extra bracket,  while pushing the tubing into the  roller race. (figure 4)  Insert the tubing into the outer port    (figure 5) and replace the cover and  screws.                             8   ...
  • Page 9: Tubing Installation Procedure C

            PROCEDURE C  Without removing the pump cover, run the entire unit at    high RPM. Pull the old tubing out from outlet port pump.  Install new tube by inserting into inlet port; continue  feeding tube 1/4” in at a time allowing the roller  assembly to push tubing through. When tubing is half  way around the race, put your finger over the inlet hole  of the tube and continue to feed tubing 1/4” at a time,  this should make installation easier. Continue until  desired tubing extension is obtained. Run unit for about  one minute.                              WARNING  ANKO PRODUCTS, INC. assumes no responsibility or liability for chemical compatibility of our  tubing in specific applications. ALWAYS pretest tubing in accordance with tubing  manufacture’s specifications. Tubing that shows signs of swelling, embrittlement, or other    deterioration should not be used. ROLLER BRACKET ASSEMBLY INSTRUCTIONS  9   ...
  • Page 10 For Roller Replacement  (A plastic roller bracket assembly is supplied with units ranging from 2 to 108 RPM. No assembly is required for the  plastic bracket. If new rollers are required a new assembly must be ordered).  To remove the roller bracket assembly from the pump, use a flat head screwdriver and  pry open both sides of the springs to the edge of the bracket.  Pull the roller bracket assembly off the shaft holding on to the roller area of the bracket.  Holding the top and bottom of the bracket, slide the spring off to the side and lay the  assembly on a flat surface. Try not to let it fall apart as you will need to put it together  the same way it is now.  Remove the top bracket and the rollers.  If a roller pin comes out of its recess, replace it at this time.  Place the new rollers on the pins and replace the top bracket. Be sure that the flat in the  inner hole of the top bracket lines up with the flat on the bottom bracket.  Slide the spring fastener back over the bracket. Do not snap the spring together.   Matching the roller bracket flat to the output shaft flat, slide the roller bracket assembly  down until it stops without using force.  Snap the spring together.             Illustration of the pump assembly.      10   ...
  • Page 11: Illustration Of Pump Head Assembly

    1‐ Fan          2‐ Screw (1) 8‐32 x 7/8”    3‐ Gearmotor    4‐ Mounting Bracket (908 only)    5‐ Pump Housing         6‐ Tube    7‐ Screws (4) 10‐32 x 1 1/4”    8‐ *Nylon Washer    9‐ Roller Bracket Assembly    10‐ Pump Cover    11‐ Screws (4) 8‐32 x 5/8”    The 908 mounting bracket is replaced with the 907 case cover on the case model.    Replacement Parts List  Contact your local distributor to order. Please remember to include the complete model  number when you place your order for replacement parts. For fan orders use the chart on page  4 for the part number.  Item ...

Table of Contents