Connect Wiring - Broan NuTone QTRE080H Instructions Manual

Humidity sensing fans
Hide thumbs Also See for NuTone QTRE080H:
Table of Contents

Advertisement

Available languages

Available languages

INSTALL HOUSING & DUCT (
1b. Mount housing anywhere between trusses,
joists, or I-joists using hanger bars.
Sliding HANGER BARS are provided to allow for
accurate positioning of housing anywhere between
framing. They can be used on all types of framing
(I-joist, standard joist, and truss construction) and
span up to 24".
S T
D
HANGER
BAR (4)
BD0002
Attach the MOUNTING CHANNELS to the housing
using the SCREWS supplied. Make sure TABS face
"up" as shown. Use the set of channel mounting
holes (marked "STD") to mount the housing fl ush
with the bottom of the drywall. Use the other set of
holes (not marked) to mount the housing fl ush with
the top of the drywall.
HOLE FOR OPTIONAL
SCREW MOUNTING (4)
NAIL (4)
Extend HANGER BARS to the width of the framing.
Hold ventilator in place with the hanger bar tabs
wrapping around the BOTTOM EDGE OF THE
FRAMING.
Nail ventilator to framing or fasten with screws (not
provided) through HOLES near NAILS.
*To ensure a noise-free mount: Secure hanger
bars together with SCREWS or use pliers to crimp
mounting channels tightly around hanger bars.
'
)
CONT
D
SCREWS (4)
TAB
MOUNTING
CHANNEL (2)
*SCREW (2)
BOTTOM EDGE
OF FRAMING
MODELS QTRE080H • QTRE100H
QTREN080H • QTREN100H
2.
Attach
damper/duct
connector.
Snap damper/duct
connector onto
housing. Make
sure connector is
fl ush with top of
housing and damper
fl ap falls closed.
3.
Install 4-inch
round ductwork.
Connect 4-inch
round ductwork
to damper/duct
connector. Run
ductwork to a roof
cap or wall cap.
Tape all ductwork
connections to make them secure and air tight.

CONNECT WIRING

ON / OFF SWITCH
(PURCHASE SEPARATELY)
ON / OFF
SWITCH
BLK
120
WHT
VAC
LINE
GRD
IN
SWITCH BOX
BE0011A
MODEL P68WN, 2-FUNCTION CONTROL
(PURCHASE SEPARATELY)
FAN
(ON/OFF)
COM
HUMIDITY
CONTROL
(AUTO/OFF)
BLK
120
WHT
VAC
LINE
GRD
IN
SWITCH BOX
BE0012A
4.
Connect electrical wiring.
Run 120 VAC house wiring to installation location.
Use proper UL approved connector to secure house
wiring to wiring plate. Connect wires as shown in
wiring diagrams.
INSTALL GRILLE
5.
Finish ceiling.
Install ceiling material. Cut out around housing.
3
ORG
BLK
BRN
HUMIDITY
CONTROL
WHT
GRD
UNIT
ORG
RED
BLK
HUMIDITY
CONTROL
BRN
BLK
WHT
GRD
UNIT
BLK
WHT
FAN
WHT
WHT
WHT
FAN
WHT
WHT

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Nutone qtren080hNutone qtre100hNutone qtren100h

Table of Contents