3.1 AS1428.1 Installation
RBA1882-100-007
Rough Wall Opening for plate:
ALTERNATIVE
POSITION ON
CENTRE-LINE
275
SIDE WALL
Fit the flush valve in the required position maintaining a minimum 700mm distance between the outlet of the vacuum
•
breaker and the centre line of the flush pipe connected to the WC pan inlet.
•
Remove face plate from mounting bracket.
•
Install mounting bracket into noggins. Ensure fixing height allows direct access to Flush Valve as shown in image
above.
•
Install Piezo buttons in face plate.
Make electrical connections: Connect Half Flush piezo to Sensor A. Connect Full Flush piezo to Sensor B. Connect
•
Solenoid valve to Valve A. Connect the Power Pack to Power 24VAC.
17 of 20
INSTALLATION, OPERATION AND MAINTENANCE INSTRUCTIONS
C L
500 MAX.
BACK WALL
ZONE POSITION
OF FLUSHING
CONTROL
Australia 1300 788 778 www.rba.com.au | New Zealand 0800 722 111 www.rbagroup.co.nz
73
SIDE WALL
ZONE POSITION
OF FLUSHING
CONTROL
40mm FLUSH PIPE
(BY OTHERS)
800
SYDNEY | MELBOURNE | BRISBANE | PERTH | AUCKLAND
C L
300 MAX.
300 MAX.
FFL