Download Print this page

Barpa NORMA 600 Series Assembly Instructions

15u up to 33u

Advertisement

Quick Links

In this first step you will need the top cover (5), the
bottom plate (8) and 2 x frame (6). Put the two parts of
frame ready to assemble this part like picture with 16 x
bolt M8*12 (C) and 16 x flange nut M8 (D);
With the cabinet in the vertical, assemble the mounting
angle (4) with 16 x bolt M6*12 (B) in the horizontal sides
of the cabinet;
SERIES NORMA 600 - 15U UP TO 33U
28x
32x
M5x10bolt
M6x12bolt
M8x12 bolt
Safety warning – Do not climb on, rock,
shake your rack. Only someone with good
mechanical skill and who has experience
should install this rack. Never exceed the
maximum load capacity. If you didn't
understood
this
please contact us by info@barpa.eu
1
1
With the cable entry panel (9) and with the castors (10),
assemble in the bottom plate with 24 x bolt M5*10 (A);
Grab the 19'' rails (3) in the vertical and mount with 16 x
bolt M6*12 (B);
16x
16x
4x
M8 flange
key
M12 adjustable
nut
instructions
manual
2
2
4x
feet
IM_01_rev.1

Advertisement

loading

Summary of Contents for Barpa NORMA 600 Series

  • Page 1 In this first step you will need the top cover (5), the With the cable entry panel (9) and with the castors (10), bottom plate (8) and 2 x frame (6). Put the two parts of assemble in the bottom plate with 24 x bolt M5*10 (A);...
  • Page 2 Take care to not exceed the 40ºC – 104ºF temperature. Accessories you can use with your Norma: • Blank Panel; • Shelfs; • Sliding Shelf; • Drawer; • Digital Temperature Unit; • Unit Fan’s; • Cable Management; • Password Lock. for more informations please go to www.barpa.eu IM_01_rev.1...

This manual is also suitable for:

Norma 3Norma 2Norma 4