Pre-Delivery Checklist - Quadivator UTV Harrow Assembly/Operators/Parts Manual

Table of Contents

Advertisement

Quadivator UTV Harrow
iii
PRE- DELIVERY CHECKLIST
Check off all items as they are found satisfactory or after adjustments are made:
1 All safety shields and guard are securely in place.
1 All decals are in place and readable.
1 Tighten all hardware – see Bolt Torque Chart in Service Section (page 8).
1 Check tire inflation pressure and set to 30 psi for Main Frame and 30 psi for Lift Frames.
1 Operate for 5 – 10 minutes, check for excessive operation or unusual noise, when using
the Quadivator UTV Harrow and attachment(s).
1 The Quadivator UTV Harrow and customer ordered attachments have been tested and to the best
of my knowledge, is ready to be delivered to the customer!
Date Pre-delivered –
Signature –
Operators Manual – Version 08

Advertisement

Table of Contents
loading

Table of Contents