Download Print this page

Toro 108-2639 Installation Instruction page 2

Blower liner kit for z400 and z500 twin and tripple baggers

Advertisement

8. Install 2 fanged elevator bolts (5/16 x 1 inch), flat
washers and locknuts (5/16 inch) into the liner and
the blower (Figure 2).
Figure 2
1. Blower
2. Fanged elevator bolt, 5/16
x 1 inch
9. Using a block of wood, push the liner down toward
the front of blower, until the blower liner tightly
conforms to the inside of the blower (Figure 3).
This will provide clearance between the impeller
and the liner.
3. Nut, 5/16 inch
4. Impeller
10. While holding the liner, tighten the 2 top bolts in
the liner and the blower (Figure 3).
11. Rotate the blower pulley to verify that the blower
fan does not hit the liner (Figure 3). Adjust the
liner if necessary.
Figure 3
1. Blower
2. Top bolt and nut
2
3. Wood block

Advertisement

loading

This manual is also suitable for:

108-2640