PRODUCT USER GUIDE
2. Get started with the HDK
Before commencing the application development, you need to configure the development platform.
2.1. Configuring the EK-AI7931LD
The top view of the EK-AI7931LD is shown in Figure 2
The description of pins (Figure 2) and their functionality is provided below:
1) CON8 transfer USB interface to UART interface, can debug through UART, transmit, and receive a
signal form PC.
2) CON8 is a USB 5V power for EK-AI7931LD, or you can use external 5V power at J1.
3) Press SW1 to reset the system For SW2~SW5 more detail, please see "section 4.4".
Figure 2. Jumpers and connectors on the EK-AI7931LD
www.acsip.com.tw
Product Name
Version
Doc No
Date
Page
EK-AI7931LD
E
912-13802
2022/11/14
5 / 26