Start-Up Checklist - Bryant 524J 07 Installation, Start-Up And Service Instructions Manual

Table of Contents

Advertisement

NOTE: To avoid injury to personnel and damage to equipment or
property when completing the procedures listed in this start-up check-
list, use good judgment, follow safe practices, and adhere to the safety
considerations/information as outlined in preceding sections of this
Installation, Start-Up, and Service document.
I. PRELIMINARY INFORMATION
OUTDOOR: MODEL NO. _________________________
SERIAL NO._______________________________
ADDITIONAL ACCESSORIES _______________________________________________________________________
II. PRE-START-UP
OUTDOOR UNIT
IS THERE ANY SHIPPING DAMAGE? (Y/N)_____________
IF SO, WHERE:__________________________________________________________________________________________
__________________________________________________________________________________________________
WILL THIS DAMAGE PREVENT UNIT START-UP? (Y/N)_______
CHECK POWER SUPPLY. DOES IT AGREE WITH UNIT? (Y/N)________
HAS THE GROUND WIRE BEEN CONNECTED? (Y/N)________
HAS THE CIRCUIT PROTECTION BEEN SIZED AND INSTALLED PROPERLY? (Y/N)_________
ARE THE POWER WIRES TO THE UNIT SIZED AND INSTALLED PROPERLY? (Y/N)__________
HAVE COMPRESSOR HOLDDOWN BOLTS BEEN LOOSENED? (Y/N)___________
CONTROLS
ARE THERMOSTAT(S) & INDOOR FAN CONTROL WIRING CONNECTIONS MADE & CHECKED? (Y/N)_________
ARE ALL WIRING TERMINALS (including main power supply) TIGHT? (Y/N)______________
HAVE OUTDOOR UNIT CRANKCASE HEATERS BEEN ENERGIZED FOR 24 HOURS? (Y/N)_________
INDOOR UNIT
HAS WATER BEEN PLACED IN DRAIN PAN TO CONFIRM PROPER DRAINAGE? (Y/N)_________
ARE PROPER AIR FILTERS IN PLACE? (Y/N)______________
HAVE FAN AND MOTOR PULLEYS BEEN CHECKED FOR PROPER ALIGNMENT? (Y/N)___________
DO THE FAN BELTS HAVE PROPER TENSION? (Y/N)_____________
PIPING
HAS FOAM SHIPPING BLOCK BEEN REMOVED FROM THE TXV (Thermostatic Expansion Valve)? (Y/N)__________
ARE LIQUID LINE SOLENOID VALVES LOCATED AT THE INDOOR UNIT (524J***A) OR OUTDOOR UNIT
(524J***H) COILS AS REQUIRED? (Y/N)___________
HAVE LEAK CHECKS BEEN MADE AT COMPRESSORS, CONDENSERS, INDOOR COILS,
TXVs (Thermostatic Expansion Valves) SOLENOID VALVES, FILTER DRIERS, AND FUSIBLE PLUGS
WITH A LEAK DETECTOR? (Y/N)____________
LOCATE, REPAIR, AND REPORT ANY LEAKS. ______________
HAVE ALL COMPRESSOR SERVICE VALVES BEEN FULLY OPENED (BACKSEATED)? (Y/N)_____________
ARE THE COMPRESSOR OIL SIGHT GLASSES SHOWING CORRECT LEVELS? (Y/N)____________
Manufacturer reserves the right to change, at any time, specifications and designs without notice and without obligations.

START-UP CHECKLIST

(SPLIT SYSTEMS WITH 524J UNITS)
INDOOR: MODEL NO. ______________________
SERIAL NO. ______________________________
Form No: II524J-7-16-02 Rev. A
CL-1
Replaces: II524J-7-16-01

Advertisement

Table of Contents
loading

This manual is also suitable for:

524j 08524j 12524j 14524j 16

Table of Contents