Download Print this page

Toro 105-3180 Installation Instructions page 3

Recycler kit for proline mid–size floating deck mower

Advertisement

Installing the Kickers
Important
Make sure the bolt heads are installed on the
inside of the cutting chamber.
1. Measure from the spindle center lines, and locate
kickers as shown in Figure 3.
2. Holding kickers tight against the cutting chamber, mark
and drill a hole for each kicker (11/32 inch dia.)
(Fig. 3).
5
6
3
4
m–6249
Figure 3
1. 4–1/4 inch (108 mm)
2. 3-1/2 inch (89 mm)
3. Mark and drill holes here
(11/32 inch dia.)
3. Install each kicker with a bolt (5/16 x 1 inch) and a
locknut (5/16 inch) (Fig. 4).
4
3
3
2
1
4. Center line
5. Spindles
6. Back of mower
.
2
1
5
4
3
m–6248
Figure 4
1. Kicker
2. Bolt, 5/16 x 1 inch
3. Lock nut, 5/16
3
5
5
4. Back of cutting chamber
5. Mark and drill hole here

Advertisement

loading