Test: IP communication with Controller ................... 103 4.4.6. AUXILIARY CONNECTIONS ........................105 5.1......................111 NPUT AND UTPUT ONTACTS 5.2. (EPO) M ....................112 MERGENCY OWER ANUAL Restarting UPS after EPO ......................113 5.2.1. UPS for 208 Vac Grid, B60US-IB Installation Guide, doc. rel. 3.3...
Page 5
BACK TO ORMAL ODE FROM AINTENANCE YPASS USING UPS WITH GENERATOR ......................138 9.1. (ATS) ....................138 UTOMATIC RANSFER WITCH SERVICE AND REPAIRS ........................139 DOCUMENT CHANGES ........................140 UPS for 208 Vac Grid, B60US-IB Installation Guide, doc. rel. 3.3...
Page 6
45: T ..................83 IGURE LARMS ICON INDICATES ALARM CONDITIONS 46: N ........................84 IGURE EXT SCHEDULED TEST SCREEN 47: B ......................85 IGURE ATTERY EST IN ROGRESS SCREEN UPS for 208 Vac Grid, B60US-IB Installation Guide, doc. rel. 3.3...
Page 7
......................... 135 IGURE YPASS MODE 88: T ATS ................138 IGURE IMING VARIABLES WHEN USING A GENERATOR AND AN 89: E ......................139 IGURE XAMPLE OF AN CONTROL PANEL UPS for 208 Vac Grid, B60US-IB Installation Guide, doc. rel. 3.3...
Page 8
.............. 137 ABLE AINTENANCE BYPASS OPERATING POSITION OF THE CIRCUIT BREAKERS 15: P ....................... 137 ABLE OSITION OF THE S IN NORMAL MODE 16: D ..........................140 ABLE OCUMENT PDATES UPS for 208 Vac Grid, B60US-IB Installation Guide, doc. rel. 3.3...
Denotes a warning. It calls attention to a procedure that, if not correctly performed or adhered to, could result in injury or loss of life. Do not proceed beyond a caution note until the indicated conditions are fully understood and met. UPS for 208 Vac Grid, B60US-IB Installation Guide, doc. rel. 3.3...
SOLAREDGE Inc. - Critical Power Service Department Available via email at Service.CP@SolarEdge.com Available during regular working hours and for urgent issues by phone at (510) 498 3333. UPS for 208 Vac Grid, B60US-IB Installation Guide, doc. rel. 3.3...
To unpack the B60US-IB UPS: Figure 2: Inspect the shipping crate for signs of damage 1. Inspect the shipping crate for any signs of damage that may have occurred while in transit. UPS for 208 Vac Grid, B60US-IB Installation Guide, doc. rel. 3.3...
NOTE! If rough handling of the UPS is suspected or if any damage is found or suspected, do not unpack the system and notify the carrier and SolarEdge Support immediately. 3. Retain the shipping crate and packaging materials for future use.
8. Carefully remove the walls, pallet stoppers, ramp securing pins and seismic brackets leaving the UPS free standing on its wooden shipping pallet. Keeps the ramp securing pins and the seismic brackets including their screws for final assembly. UPS for 208 Vac Grid, B60US-IB Installation Guide, doc. rel. 3.3...
Figure 8: System Placement 11. Carefully roll the system down the ramp into the final installation site. 12. Carefully remove the plastic wrapping and all other packaging material from the UPS. UPS for 208 Vac Grid, B60US-IB Installation Guide, doc. rel. 3.3...
Page 16
Be careful to avoid scratching the finish of the Modular UPS. 13. Remove all packaging material and leave the installation site clean. 14. Reassemble the seismic brackets to the UPS for installation. UPS for 208 Vac Grid, B60US-IB Installation Guide, doc. rel. 3.3...
To safely service the UPS open all AC and DC (input, output, and battery) circuit breakers, and open all protective battery fuses (for positive and negative poles, as well as for mid- points). Verify 0v across all UPS terminals relative to ground. UPS for 208 Vac Grid, B60US-IB Installation Guide, doc. rel. 3.3...
Page 18
WARNING - RISK OF LETHAL ELECTRIC SHOCK: This UPS receives power from more than one source! Disconnection of all AC sources and DC sources is required to de-energize this unit before servicing. UPS for 208 Vac Grid, B60US-IB Installation Guide, doc. rel. 3.3...
WARNING - RISK OF LETHAL ELECTRIC SHOCK: This UPS receives power from more than one source! WARNING - RISK OF LETHAL ELECTRIC SHOCK: Do not touch uninsulated battery terminals. UPS for 208 Vac Grid, B60US-IB Installation Guide, doc. rel. 3.3...
Up to three (3) power modules each providing 20 kVA/18 kW Static switch module System controller Up to three (3) internal battery banks NOTE! Maximum output capacity of the UPS is 60 kVA/54 kW. UPS for 208 Vac Grid, B60US-IB Installation Guide, doc. rel. 3.3...
Figure 9: Major Components of UPS System UPS for 208 Vac Grid, B60US-IB Installation Guide, doc. rel. 3.3...
Page 22
For additional information, see Section 5. Dry contacts and communication connections (Connector group 2). For additional information, see Section 5. Internal Batteries CBs, Surge Arrestor, AC fuses and LVD DC fuses Internal Battery Bank UPS for 208 Vac Grid, B60US-IB Installation Guide, doc. rel. 3.3...
Figure 10: Front Service Panel Table 2: Key to Figure 10 Item Description Input AC fuses LVD DC fuses Internal batteries CBs Internal batteries DC fuses Surge Arrestor UPS for 208 Vac Grid, B60US-IB Installation Guide, doc. rel. 3.3...
4.1. Important Installation Information WARNING - RISK OF LETHAL ELECTRIC SHOCK: The SolarEdge UPS must be connected in a “4-wire + Ground” configuration (i.e., 3 phases + Neutral + Ground). The voltage displayed on the status screen is the Phase-to-Neutral voltage.
Complete the following pre-installation checklist before installing the UPS. When the pre-installation checklist is complete, e-mail a digitally scanned copy to your vendor and to SolarEdge at Service.CP@SolarEdge.com or to Https://criticalpower.SolarEdge.com/us/customer-service. UPS for 208 Vac Grid, B60US-IB Installation Guide, doc. rel. 3.3...
Page 27
Pre-Installation Checklist – SolarEdge B60US Modular UPS Customer Information Company Name Site Contact Telephone # Cell # Fax # Scheduled Startup Date Time Facility Information Address UPS for 208 Vac Grid, B60US-IB Installation Guide, doc. rel. 3.3...
Page 28
Equipment UPS One Model # UPS Serial # Project # UPS for 208 Vac Grid, B60US-IB Installation Guide, doc. rel. 3.3...
Page 29
Verify the following shop drawings have been reviewed and compared to the installation: 1) System One Line Drawing 2) System Interconnect Drawing 3) UPS Interconnect Drawing UPS for 208 Vac Grid, B60US-IB Installation Guide, doc. rel. 3.3...
Page 30
Please list any safety requirements for contractors working on site? b) Please list any protective equipment requirements for contractors working on site? c) Please list any security restrictions and identification requirements applicable to contractors on site? UPS for 208 Vac Grid, B60US-IB Installation Guide, doc. rel. 3.3...
Section 0 and Section 4.4. When the installation checklist is complete, e-mail a digitally scanned copy to your vendor and to SolarEdge at Service.CP@SolarEdge.com or to Https://criticalpower.SolarEdge.com/us/customer-service. UPS for 208 Vac Grid, B60US-IB Installation Guide, doc. rel. 3.3...
Page 32
Installation Checklist for the SolarEdge Modular UPS Customer Address Site Phone E-mail Serial numbers: System _________________Static Switch ____________________ Controller _______________ Modules 1___________ 2___________ 3___________ Technician Name Date Signature UPS for 208 Vac Grid, B60US-IB Installation Guide, doc. rel. 3.3...
Page 33
Visual Inspection √ Activity Reference Requirements 1. Verify the physical 4.3.1 No physical damage integrity of the system In case of physical damage, photograph the damage and describe it here: UPS for 208 Vac Grid, B60US-IB Installation Guide, doc. rel. 3.3...
Page 34
UPS for temperature < 86°F/30°C (see Figure 14). Recommended minimum clearances for air ventilation around the UPS for temperature > 86 F/30 C. Comments on site preparation – physical: UPS for 208 Vac Grid, B60US-IB Installation Guide, doc. rel. 3.3...
Page 35
Mechanical Test Warning: 20kVA power modules without “SE” in their P/Ns only fit installation in B60US-IB/B120US racks without “SE”, in their P/Ns. A safety mechanical hard stop is used to prevent accidently missing this warning. Additionally, using extreme force to insert modules into racks may damage the power modules, break connectors, and overrun the safety mechanism.
Page 36
9. For each BYPASS phase, use the measurements taken in 14-16 use the following formula to compute the acceptable phase-to-ground voltage range. (Voltage between L and N) + (voltage between N and Gnd) = (voltage between L and G) UPS for 208 Vac Grid, B60US-IB Installation Guide, doc. rel. 3.3...
Page 37
EVERY tray! WARNING! There must be at least one battery set for each power module in the system. UPS for 208 Vac Grid, B60US-IB Installation Guide, doc. rel. 3.3...
Page 38
1. Open all fuses. a negative 2. Verify proper polarity voltage = -216Vdc. and voltage across each Positive pole to midpoint has battery set fuse a positive terminals (F1-F4). UPS for 208 Vac Grid, B60US-IB Installation Guide, doc. rel. 3.3...
Page 39
UPS as per Figure 26. 8. Leave SW1 and SW2 open (“OFF”). 9. Verify voltages and polarity between the battery sets. 10. Assemble all battery protective fuses. 11. Turn off all battery CBs UPS for 208 Vac Grid, B60US-IB Installation Guide, doc. rel. 3.3...
Page 40
ON the rectifier circuit breakers only! Keep the bypass, output, and battery breakers OFF. LCD screen will turn on. 2. The System Controller will switch ON. UPS for 208 Vac Grid, B60US-IB Installation Guide, doc. rel. 3.3...
Page 41
6. Verify time and date are correct. Comments on site preparation – electrical: UPS for 208 Vac Grid, B60US-IB Installation Guide, doc. rel. 3.3...
Page 42
(according to local safety requirements). 12. Verify that there is 0V across all terminals relative to ground. 13. Attach rectifier and bypass input links. 1. Rectifier L1-Bypass L1 UPS for 208 Vac Grid, B60US-IB Installation Guide, doc. rel. 3.3...
Page 43
Verify that the modules are 20. Turn ON the battery and bypass charging the batteries and input breakers. providing output voltage. 21. Verify communication with all power modules and static switch. UPS for 208 Vac Grid, B60US-IB Installation Guide, doc. rel. 3.3...
Page 44
2. With the output circuit breaker in the off position: Use an external multimeter and record the following measurements on the UPS side of the output circuit breaker. 3. AC output phase-to-neutral voltages (should be 120 V, ±2%). UPS for 208 Vac Grid, B60US-IB Installation Guide, doc. rel. 3.3...
Page 45
9. If the output is not with in the acceptable tolerance, disable auto correction and perform an AC output adjust and correct the output voltage. Note. Refer to the service guide for "AC output adjustment". UPS for 208 Vac Grid, B60US-IB Installation Guide, doc. rel. 3.3...
Page 46
Normal Mode √ Activity 1. Transfer load to the inverter. Verify that the system is running on normal mode. (main>operation>transfer load>transfer load to inverter) UPS for 208 Vac Grid, B60US-IB Installation Guide, doc. rel. 3.3...
Page 47
8. Export the system log after System Controller updates. Important: The 9. Navigate to main>operation>turn system must be on/off and select System Off button. completely turned off before component software upgrade. UPS for 208 Vac Grid, B60US-IB Installation Guide, doc. rel. 3.3...
Page 48
6. Select the PFC modules to be updated by checking the appropriate PFC checkboxes and then select the Start button. 7. Turn on the system by navigating to main>operation>turn on/off and select System On button. UPS for 208 Vac Grid, B60US-IB Installation Guide, doc. rel. 3.3...
Page 49
7. Run the system 5-10 minutes. 8. Transfer system back to UPS mode. (Main>operation>self-loading mode>UPS mode) 9. Press Confirm. Note. This test is optional. 5. (C) Battery mode test: UPS for 208 Vac Grid, B60US-IB Installation Guide, doc. rel. 3.3...
Page 50
6. To disable ECO mode in the system, deselect the Enabled checkbox and press Confirm. Note. Do not select the Analyze grid checkbox, or any of the Custom Reliability options. Note. This test is optional. UPS for 208 Vac Grid, B60US-IB Installation Guide, doc. rel. 3.3...
Page 51
(main>setup>system>maintenance> Maintenance Alarm list) 9. Save the system user settings. (main>setup>save & Restore>save settings) 10. Insert USB into the System Controller and export the system user settings. (main>setup>save & Restore>export settings) UPS for 208 Vac Grid, B60US-IB Installation Guide, doc. rel. 3.3...
Page 52
System Controller. NOTE! The system is shipped fully calibrated in the factory and no field calibration is necessary. Contact SolarEdge support at Support.CP@solaredge.com for any calibration related question. UPS for 208 Vac Grid, B60US-IB Installation Guide, doc. rel. 3.3...
1. Inspect the UPS from all angles and ensure that there is no visible damage to any part of the cabinet, the module housings, or other coverings. 2. Verify that the LCD display screen is undamaged. 3. Verify that the number of modules delivered is as ordered. UPS for 208 Vac Grid, B60US-IB Installation Guide, doc. rel. 3.3...
Recommended minimum clearances specifications around the UPS are provided in Table 5 and Figure 14. 6. It is recommended that the battery cabinets be located adjacent to the UPS. UPS for 208 Vac Grid, B60US-IB Installation Guide, doc. rel. 3.3...
Figure 13: Dimensions of SolarEdge B60US-IB UPS (2) UPS for 208 Vac Grid, B60US-IB Installation Guide, doc. rel. 3.3...
Page 57
Dimensions of SolarEdge B60US-IB UPS Width 39.5 in. (1000mm) Height 79.1 in. (2009mm) Depth 27.6 in. (700 mm) NOTE! For rear installation, the cable stress reliever is required (see Section 4.3.5.7). UPS for 208 Vac Grid, B60US-IB Installation Guide, doc. rel. 3.3...
The UPS unit can be connected and then pushed toward the back wall. However, make certain you comply with minimum rear distance and UPS minimum clearance requirements and regulations. For additional information, see Table 5 below. UPS for 208 Vac Grid, B60US-IB Installation Guide, doc. rel. 3.3...
UPS and the other equipment. The object here is to avoid subjecting the UPS to additional heat and to protect the UPS from stray electronic signals. UPS for 208 Vac Grid, B60US-IB Installation Guide, doc. rel. 3.3...
3. Fully slide all power modules into the base and secure them tightly with the right and left screws. UPS for 208 Vac Grid, B60US-IB Installation Guide, doc. rel. 3.3...
UPS, are compliant with all local and national electrical and safety codes as well as SolarEdge system specifications. Verify that they are all locked in the OFF position, in accordance with local safety regulations. The following circuit breakers must be in the OFF position: rectifier and bypass AC input, AC output and all battery cabinets.
The UPS leaves the factory with the bypass and rectifier AC input terminals bridged to allow for single feed installation. If you desire a dual feed installation remove the single feed bridge/link from each input phase. UPS for 208 Vac Grid, B60US-IB Installation Guide, doc. rel. 3.3...
This can result in the problems described above. AC Input and Output connections 4.3.5.3. WARNING - RISK OF LETHAL ELECTRIC SHOCK: INSTALLATION MUST BE PERFORMED BY A QUALIFIED TECHNICIAN ONLY! UPS for 208 Vac Grid, B60US-IB Installation Guide, doc. rel. 3.3...
Page 64
For dual feed: Connect the rectifier AC input, bypass AC input, and AC output cables to the UPS. For single feed: Connect the rectifier AC input, and AC output cables to the UPS. UPS for 208 Vac Grid, B60US-IB Installation Guide, doc. rel. 3.3...
Figure 17: Terminal connections NOTE! Access to main terminals of the B60US-IB are accessible by simply opening the back door of the UPS. To the electrical panel to which the UPS is connected, affix a sign or label with the...
Connecting the UPS to the electrical panel 4.3.5.4. When connecting the electrical panel to The SolarEdge UPS, a torque of 10 to 20 Nm is recommended on the UPS terminal side. The lug size needed to fit a 3/8" or metric M10 screw size.
Battery Power 18.54 37.08 55.62 Max DC Current Amps Rating for Fast Blow Fuses Amps WARNING! If local electrical codes are stricter than the above recommendations, local codes take priority. UPS for 208 Vac Grid, B60US-IB Installation Guide, doc. rel. 3.3...
NOTE! All battery terminal connection torque values must be in accordance with the battery manufacturer specifications. UPS for 208 Vac Grid, B60US-IB Installation Guide, doc. rel. 3.3...
The eighth battery on each tray is to be connected to the black negative cable plug attached to the connector at the back of each shelf. Make certain to use the terminal insulator. UPS for 208 Vac Grid, B60US-IB Installation Guide, doc. rel. 3.3...
(4 ) and fifth (5 ) battery on each tray. They allow for a safe disconnect of every 48V. Make sure to use the terminal insulators. UPS for 208 Vac Grid, B60US-IB Installation Guide, doc. rel. 3.3...
Figure 23: Cable plugs on one end, Anderson-type plugs on the other Figure 24: One of the internal battery banks UPS for 208 Vac Grid, B60US-IB Installation Guide, doc. rel. 3.3...
+175 V and -175 Vdc. 11. FAST FUSES (SEMICONDUCTOR FUSES) must be used between the battery and the SolarEdge UPS. For example, the Ferraz Shawmut A70QS fuse (F1, F2, F3 and F4 in Figure 25 and Figure 26. 12. For initial startup to take place, the battery must be connected to the UPS and must be available.
16. Connect the battery set to UPS’s positive (“+”) battery bus bar, negative (“–“) battery bus bar, and Neutral bus bar (See Figure 25). 17. If you are planning on using lithium-ion batteries, contact SolarEdge support for installation and configuration instructions.
Current values are for fuses F1 through F4 in Figure 12 and are based on 10- minute backup time at full load. If longer backup time is required, please consult with SolarEdge Support. UPS for 208 Vac Grid, B60US-IB Installation Guide, doc. rel. 3.3...
F1 through F4. Fuses F5 and F6 and DC SW# 1 and #2 (Figure 26) must be rated according to the DC current rating of the system to safely disconnect the batteries. UPS for 208 Vac Grid, B60US-IB Installation Guide, doc. rel. 3.3...
1. Remove the vertically oriented screen from the lower rear of the UPS (See Figure 27). NOTE! It is mandatory to use the stress reliever for rear installations. It is not needed for bottom installations. UPS for 208 Vac Grid, B60US-IB Installation Guide, doc. rel. 3.3...
If the UPS cables are thick, the rear cover (item 3 in the diagram) is not recommended. If the cables are thin you may want to use the rear cover as a gland plate. Figure 29: Wire stress reliever connection UPS for 208 Vac Grid, B60US-IB Installation Guide, doc. rel. 3.3...
Attaching optional seismic brackets 4.3.5.8. The SolarEdge modular 3 phase UPS comes standard with seismic brackets for anchoring the unit to the floor. Figure 30: Seismic Bracket Assembly In areas with frequent seismic activity, anchoring of the system may be required. The UPS comes with a right and left bracket that is simple to assemble.
5. Reassemble the 3 screws in the elliptical holes of the bracket to secure the bracket to the system frame. Mark the 3 points on the floor and use the appropriate anchoring screws for the floor material. UPS for 208 Vac Grid, B60US-IB Installation Guide, doc. rel. 3.3...
Check the values in the setup>battery parameters against the information in the battery manufacturer’s data sheet. Verify that the parameter values are appropriate for the batteries you have chosen. UPS for 208 Vac Grid, B60US-IB Installation Guide, doc. rel. 3.3...
After the UPS is activated, the Start screen appears: Figure 32: Initial configuration wizard: Start screen 2. Write down the MAC address displayed on the screen and press Next. The Password screen appears: UPS for 208 Vac Grid, B60US-IB Installation Guide, doc. rel. 3.3...
Figure 33: Initial configuration wizard: password entry 3. Type the Technician password you received form SolarEdge in the Password text input field and press OK. Without a password you cannot continue Wizard mode. NOTE! If the technician password is not accepted press Exit and adjust the date and time of the controller: main>setup>time>Adjust date/time...
4. Indicate the capacity of the connected batteries in ampere/hours (Ah), then select Next. This capacity figure is used by the UPS when it is in battery mode, to calculate the amount of backup time remaining. The Set Time Zone screen appears: UPS for 208 Vac Grid, B60US-IB Installation Guide, doc. rel. 3.3...
Figure 36: Finish Configuration Wizard 6. Select Finish. The initialization menu wizard exits and the System Controller restart. 7. Verify that the UPS profile default settings meet site requirements (main>profile). UPS for 208 Vac Grid, B60US-IB Installation Guide, doc. rel. 3.3...
For detailed explanations of how to change each parameter refer to the Service Guide. 9. Verify that the time and date are correct (main>setup>time>adjust date/time). Figure 38: Adjust date/time screen Press Confirm. 10. Continue the first-time installation process (See Section 4.3.6.3). UPS for 208 Vac Grid, B60US-IB Installation Guide, doc. rel. 3.3...
LED indicator to turn orange. Figure 40: Rectifier LED 4. If the power modules were shut down during factory quality testing, you will have to manually turn on the module. (main>operation>on/off>modules on) UPS for 208 Vac Grid, B60US-IB Installation Guide, doc. rel. 3.3...
7. After all modules have been powered up perform a complete system shutdown. (main>operation>turn on/off>system off). The Confirm Turning the System Off screen appears: Figure 43: Confirm Disconnecting the Load 8. Confirm OK. UPS for 208 Vac Grid, B60US-IB Installation Guide, doc. rel. 3.3...
(i.e., Normal Mode). Verify on the Status screen (main>status). 19. Verify battery voltage on the Status screen (main>status>battery). 20. Check input, bypass output, and DC voltages. UPS for 208 Vac Grid, B60US-IB Installation Guide, doc. rel. 3.3...
28. Verify on the status screen that the input voltages and current readings for the rectifier are accurate. 29. Check output values: Verify that the system is on (normal mode) inverter output, if not transfer the load to the inverter. UPS for 208 Vac Grid, B60US-IB Installation Guide, doc. rel. 3.3...
35. Perform a battery test to verify that the UPS is ready and able to operate in battery mode when it is needed. (main>operation>battery test>test battery). The Test in Progress screen appears: Figure 46: Next scheduled test screen 36. Press Test Battery. UPS for 208 Vac Grid, B60US-IB Installation Guide, doc. rel. 3.3...
Testing (Section 4.4). 38. Transfer the unit to bypass. (main>operation>transfer load>transfer to bypass) The Transfer load to bypass screen appears: Figure 48: Confirm Transfer Load to Bypass 39. Select OK. UPS for 208 Vac Grid, B60US-IB Installation Guide, doc. rel. 3.3...
Figure 49: Confirm Transfer Load to Inverter dialog 43. Press OK. 44. Record load current for all 3 phases. Verify that all modules are equally balancing the load ±2%. UPS for 208 Vac Grid, B60US-IB Installation Guide, doc. rel. 3.3...
To obtain an IP address automatically, your network must support DHCP. 1. From the System Menu select Setup>Connectivity>Network Configuration. The IP address configuration screen appears: Figure 50: IP Address Configuration UPS for 208 Vac Grid, B60US-IB Installation Guide, doc. rel. 3.3...
DNS address and a secondary DNS address. 3. Type the addresses (including digits and dots that make up the address) using the virtual keyboard of the LCD panel in the appropriate text input fields. UPS for 208 Vac Grid, B60US-IB Installation Guide, doc. rel. 3.3...
This will set a system maintenance reminder alarm one year from the current date. 8. Press Confirm. Finally, you must save the settings you have defined. 9. To save the settings you defined, go to main>setup>save and restore>save settings. UPS for 208 Vac Grid, B60US-IB Installation Guide, doc. rel. 3.3...
12. This will allow for future service personnel to upgrade the system efficiently and according to the site requirement settings. main>setup>save & Restore>Export settings. The system is now supporting the load. UPS for 208 Vac Grid, B60US-IB Installation Guide, doc. rel. 3.3...
It allows for the rectifiers, inverters, and bypass modules to be loaded to capacity. This method if testing should not be used for battery mode or current calibrations. UPS for 208 Vac Grid, B60US-IB Installation Guide, doc. rel. 3.3...
Figure 54: Enable Self-loading mode 2. Select Enable and then select Confirm. Self-loading mode is enabled. 3. Transfer system from VF mode to Self-loading mode with 2 kW active load. (main>operation>self-loading setup) UPS for 208 Vac Grid, B60US-IB Installation Guide, doc. rel. 3.3...
The UPS On – Self-loading Output status screen appears: Figure 56: Self-Loading Mode 9. Verify that the Rectifier Input current level has increased and the Static switch is bridged to the inverter (See Figure 56). UPS for 208 Vac Grid, B60US-IB Installation Guide, doc. rel. 3.3...
10% increments back down to 0 using the Active power slider and Reactive power slider. 15. Transfer the system back to VF mode to return the UPS back to normal system operation. 16. Disable Self-Loading mode. (main>setup>system>system type>self-loading) UPS for 208 Vac Grid, B60US-IB Installation Guide, doc. rel. 3.3...
The Self-Loading Setup screen appears: Figure 58: Disabling Self-Loading mode 17. Select Disable and press Confirm. The system is back in full operation and is ready to be used as a UPS. UPS for 208 Vac Grid, B60US-IB Installation Guide, doc. rel. 3.3...
4. Check and record the total system load (output current) and make sure that the UPS is not overloaded with respect to system specifications. 5. Verify that UPS is operating normally and that no alarms or fault indications are present. UPS for 208 Vac Grid, B60US-IB Installation Guide, doc. rel. 3.3...
It should be within the specified range of 120 VAC ±3%. 3. When complete turn AC input on. The batteries revert to charging. 4. Wait for the battery to complete the recharge to gauge the charge/discharge cycle. UPS for 208 Vac Grid, B60US-IB Installation Guide, doc. rel. 3.3...
2. From the Generator drop down menu choose dry contact 2 and select Confirm. Now that it is enabled the battery charging current will be limited when the contact opens or closes depending on controller setting configuration. UPS for 208 Vac Grid, B60US-IB Installation Guide, doc. rel. 3.3...
3. Disconnect the primary input feed. 4. Verify that the ATS transfer time was greater than 10 seconds. 5. Verify stability of UPS output. 6. Verify limited charging current to the battery (<2A). UPS for 208 Vac Grid, B60US-IB Installation Guide, doc. rel. 3.3...
1. Switch to authorization level Technician. 2. Go to main>setup>system>system type>ECO Mode. The Password screen appears. 3. Type in the SolarEdge password key you received from SolarEdge support in the Password text input field. 4. Click OK. The ECO Mode screen appears: Figure 61: ECO Mode screen - Enabled checkbox 5.
The ECO Mode off button is toggled on. The next step is to confirm ECO Mode is active. 8. Go to main>status. The Status screen appears: Figure 63: Status screen, UPS ON and ECO Mode ON UPS for 208 Vac Grid, B60US-IB Installation Guide, doc. rel. 3.3...
Page 110
The system will run on ECO mode until either there is a variant in the grid power supply, or the system is manually transferred back to normal mode. You have successfully 1) enabled ECO Mode, and 2) turned ECO Mode on. UPS for 208 Vac Grid, B60US-IB Installation Guide, doc. rel. 3.3...
4. Open a browser on the external computer and enter the IP address of the UPS’s System Controller in the browser’s address field to verify that you can reach the Web server on the System Controller. The UPS System Menu should appear: UPS for 208 Vac Grid, B60US-IB Installation Guide, doc. rel. 3.3...
Figure 65: Location of Connector Groups 1 and 2 on the front of the UPS Location of connector groups 1 and 2 is shown in Figure 65, and close-up views of the connectors are shown further on in the text where relevant. UPS for 208 Vac Grid, B60US-IB Installation Guide, doc. rel. 3.3...
Supplies 48 VDC for battery trip coil.) Contacts for Emergency Power-Off (EPO) switch, N.O. Triggers the battery trip coil which opens the battery CB, when the EPO switch is pressed. UPS for 208 Vac Grid, B60US-IB Installation Guide, doc. rel. 3.3...
LVD (this works in tandem with P13 pins 1 and 3) Digital output #3 Do NOT remove P2 or P13 Digital output #4 Digital output #5 Digital output #6 Digital output #7 Digital output #8 UPS for 208 Vac Grid, B60US-IB Installation Guide, doc. rel. 3.3...
Page 116
Digital input #2 (Optional: Generator mode) Common Digital input #3 Surge protector fault Common Digital input #4 (Optional: Maintenance bypass) Common Digital input #5 Battery 1 CB is off Common UPS for 208 Vac Grid, B60US-IB Installation Guide, doc. rel. 3.3...
Page 117
+12 V Battery current #1 Do NOT remove -12 V +12 V Battery current #1 -12 V +12 V Battery current #1 Negative Battery Current -12 V Digital output #2 UPS for 208 Vac Grid, B60US-IB Installation Guide, doc. rel. 3.3...
Page 118
MODBUS over serial and IP can be used to connect UPS to building management systems. For additional information or for purchasing the MODBUS enabler license, contact your SolarEdge Critical Power division representative. UPS for 208 Vac Grid, B60US-IB Installation Guide, doc. rel. 3.3...
Connector groups 1 and 2 (see Figure 65). NOTE! The dry contacts can be set up and configured at any time. Refer to The UPS User Guide for detailed instructions on configuration of the dry contacts. UPS for 208 Vac Grid, B60US-IB Installation Guide, doc. rel. 3.3...
NOTE! Make certain to perform a continuity test on the EPO switch before connecting it to the UPS. UPS for 208 Vac Grid, B60US-IB Installation Guide, doc. rel. 3.3...
The MOV surge protector makes use of one of the input dry contacts to transmit the alarm to the UPS. This relay is normally open and closes when the surge arrestor detects a malfunction. UPS for 208 Vac Grid, B60US-IB Installation Guide, doc. rel. 3.3...
UPS System Controller. Assign the corresponding input dry contact to normally open or normally closed according to the aux signal of the breaker. Label the dry contact name to "battery breaker". UPS for 208 Vac Grid, B60US-IB Installation Guide, doc. rel. 3.3...
Figure 71: Active alarms Turn the battery circuit breaker back on and verify the alarm disappears. NOTE! For additional information about configuring the LVD function, refer to the UPS User Guide. UPS for 208 Vac Grid, B60US-IB Installation Guide, doc. rel. 3.3...
Thermal tripping can be useful on circuits that are subject to expected short-term current overload, such as when a load with high-inrush current is turned on. In such a case you UPS for 208 Vac Grid, B60US-IB Installation Guide, doc. rel. 3.3...
Page 125
NOTE! Where local electrical codes are more stringent than the above recommendations, local electrical codes take priority. UPS for 208 Vac Grid, B60US-IB Installation Guide, doc. rel. 3.3...
Parallel Operation SolarEdge modular UPS systems can be paralleled together to support large loads and provide horizontal system redundancy. The multi-rack system allows for full current sharing at a modular level without the need for additional hardware. By connecting one system communication to the next, units can operate simultaneously while in full synchronization.
To avoid such a hazard in decentralized mode, the static switches are synchronized by dedicated control communication to ensure that if one unit goes to Bypass mode, the rest of the units will also transfer to Bypass mode simultaneously. UPS for 208 Vac Grid, B60US-IB Installation Guide, doc. rel. 3.3...
When two or more UPS units are operated in parallel, parallel communication must take place between them in a "ring" arrangement. This is accomplished using the SolarEdge- provided cables with D25 connectors on each end. Parallel communication keeps the parallel units synchronized with each other and is used to pass commands and status information between units.
Figure 75 (above) shows connections for the two parallel communication cables when two or more UPS’s are being operated in parallel configuration. All parallel communication cables (the 25-pin cables) must be housed in appropriate conduits. UPS for 208 Vac Grid, B60US-IB Installation Guide, doc. rel. 3.3...
Common vs. Decentralized battery 7.1.2.2. SolarEdge UPS systems running in parallel can be setup in one of two ways to batteries: 1. Common battery. Common battery is a single battery connection that is shared between all the UPS systems that are running in parallel.
3. In a parallel configuration, the length of the bypass input cable must be the same on all the UPSs, and the bypass input cables must be at least 10 meters in length. UPS for 208 Vac Grid, B60US-IB Installation Guide, doc. rel. 3.3...
See Figure 82). 6. Turn on one of the systems. This system will become the “master” system. Wait until the startup procedure is complete – you will see the System Menu. UPS for 208 Vac Grid, B60US-IB Installation Guide, doc. rel. 3.3...
UPSs themselves will designate one of the UPSs as the Master and the remaining UPSs will be the slaves. Figure 79: The crown icon indicates the Master Power Module UPS for 208 Vac Grid, B60US-IB Installation Guide, doc. rel. 3.3...
Page 134
If the difference in output voltage is greater than 2 % for any phase, navigate to the main>status screen, tap the Modules icon, and then tap the Output tab at the bottom of the page. UPS for 208 Vac Grid, B60US-IB Installation Guide, doc. rel. 3.3...
19. Compare the output current from each pair of systems in bypass and on inverter (normal mode). Under full load, the difference in output current between any two systems should not exceed ±10 % of the total system output current. UPS for 208 Vac Grid, B60US-IB Installation Guide, doc. rel. 3.3...
Page 136
20. The parallel systems are now ready for use for any loads up to the maximum rated output in kW of the combined systems. UPS for 208 Vac Grid, B60US-IB Installation Guide, doc. rel. 3.3...
The rating of circuit breaker CB12 in the connection schematics must be appropriate for the number of parallel UPSs. Table 11: Rating of CB12 (for maintenance bypass option) Number of Recommended rating parallel UPSs for CB12 (Amps) UPS for 208 Vac Grid, B60US-IB Installation Guide, doc. rel. 3.3...
Verify 0V across ALL terminals before disconnecting the system. NOTE! The normally open aux contact of the maintenance bypass circuit breaker must be wired to the "forced bypass" contact found in connector group 1 P12. UPS for 208 Vac Grid, B60US-IB Installation Guide, doc. rel. 3.3...
2. Verify that all three phases of the bypass input voltages are present, and the inverter and bypass are synchronized on the System Controller Status screen. If they are not, the UPS cannot transfer to bypass mode. 3. Go to main>operation>transfer load>transfer load to bypass. UPS for 208 Vac Grid, B60US-IB Installation Guide, doc. rel. 3.3...
The UPS On – Bypass mode screen appears: Figure 87: UPS ON - Bypass mode Notice the UPS ON Bypass mode message on the screen. 6. Verify that the load is being supported by the bypass. UPS for 208 Vac Grid, B60US-IB Installation Guide, doc. rel. 3.3...
(CB 3) (CB 5) (CB 6) 6. Verify 0V across all terminals in the system. The system is now in maintenance bypass mode and can now be safely serviced. UPS for 208 Vac Grid, B60US-IB Installation Guide, doc. rel. 3.3...
Table 15: Position of the CBs in normal mode Battery box Rectifier AC Bypass AC UPS AC Maintenance input (on input input output bypass battery box) (CB 2) (CB 3) (CB 5) (CB 6) UPS for 208 Vac Grid, B60US-IB Installation Guide, doc. rel. 3.3...
Figure 88 illustrates the timing factors involved when using an ATS. For proper functioning of the UPS, the values used for T3 and T4 must be greater than 10 seconds. Figure 88: Timing variables when using a generator and an ATS UPS for 208 Vac Grid, B60US-IB Installation Guide, doc. rel. 3.3...
Service and Repairs IMPORTANT NOTICES Any company whose technicians have been trained by SolarEdge and has received proper authorization and certification has SolarEdge’s permission to apply modifications to our products in North America. Modifications could entail adding or removing modules as well as performing service or maintenance.
Improved document formatting, layout. Rev 3.1: May 2020 SE logo Rev 3.2: June 2020 More efficient start up process and general update Rev 3.3: Mar 2021 Front access add-ons UPS for 208 Vac Grid, B60US-IB Installation Guide, doc. rel. 3.3...