General Maintenance And Care Instructions; Seasonal Startup; Clean Flue Gas Passageways - ECR International Dunkirk DXL-060K Installation, Operation & Maintenance Manual

Cast iron gas fired boilers for forced hot water with hydrolevel 4200 control
Table of Contents

Advertisement

!
WARNING
Label all wires prior to disconnection when servicing
controls. Wiring errors could cause improper and
dangerous operation.

14.1 Seasonal Startup

• Before seasonal start-up, have a certified service agency
check boiler for soot and scale in flues, clean burners
and check gas input rate to maintain high operating
efficiency.
• Verify proper operation after servicing.
• Service agency will verify system is filled with water to
minimum pressure and open air vents, if used, to expel
any air accumulated in the system. Check entire piping
system and, if any leaks appear, have them repaired.
• Circulators need to be checked and maintained. Refer to
circulator manufacturer's instructions.
• Inspect venting system at the start of each heating
season.
◊ Check vent pipe from boiler to chimney for signs
of deterioration by rust or sagging joints. Repair if
necessary.
◊ Remove vent pipe at base of chimney or flue and
using a mirror, check vent for obstruction and verify
vent is in good working order.
• Boiler flue gas passageways may be inspected by a light
and mirror.
◊ Remove burner door.
◊ Place trouble lamp in flue collector through draft relief
opening or flue inspection cover.
◊ With mirror positioned above burners, flue gas
passageways can be checked for soot or scale

14 - GENERAL MAINTENANCE AND CARE INSTRUCTIONS

See
Figure 13-1 page 29

14.2 Clean Flue Gas Passageways

Follow this procedure to clean flue gas passageways:
1.
Remove burner tray from heat exchanger by
disconnecting the gas supply, by removing two (2)
nuts. Pull out the assembly. see Figure 14-1 page 31.
2.
Remove top jacket panel.
3.
Remove flue inspection cover.
4.
Place sheet of heavy paper or similar material over
bottom of base and brush down flue passageways. Soot
and scale will collect on paper and is easily removed
with the paper.
5.
With paper still in place in base, clean top of boiler
castings of boiler putty or silicone used to seal between
castings and flue collector. Verify chips are not lodged
in flue passageways.
When cleaning process is complete, restore boiler
components to their original position. Use IS-808 GE
silicone (available from distributor) to seal around flue
collector, and inspection cover if required.
.
30
PN 240013268 Rev. D [08/15/2021]

Advertisement

Table of Contents
loading

Table of Contents