(3) Press the red button of master battery to power on, all the battery LED light will be on one by
one from the Master battery:
If all the battery LED lights on, and then off, which means the battery system is good and working.
NOTE
After installation, do not forget to register online for full warranty: http://www.zruipower.com
NOTE
•
To avoid current pulse of the inverter, add on the battery bank. Shall start inverter first or switch on breaker between battery and inverter after
all connected batteries turned on.
•
Between battery bank and inverter should install breaker to protect system safety.
•
All the installation and operation must follow local electric standard.
INSTALLATION