(3) Press the red button of master battery to power on, all the battery LED light will be on one by
one from the Master battery:
If all the battery LED lights on, and then off, which means the battery system is good and working.
NOTE
After installation, do not forget to register online for full warranty: http://www.zruipower.com
NOTE
To avoid current pulse of the inverter, add on the battery bank. Shall start inverter first or switch on breaker between battery and inverter after
all connected batteries turned on.
Between battery bank and inverter should install breaker to protect system safety.
All the installation and operation must follow local electric standard.