IMPORTANT INSTALLATION NOTES!
1.
THE PURCHASERS OF FLOOR STAND TANK/HOPPER SCALE COMPONENTS
ARE ADVISED TO INSTALL SAFETY STAY RODS. CARDINAL SCALE
MANUFACTURING CO. (CSMC) WILL NOT BE RESPONSIBLE FOR THE
STABILITY OF THE TANK.
2.
IT IS RECOMMENDED THAT ALL PIPE CONNECTIONS TO THE TANK BE
FLEXIBLE. (CONSULT FACTORY FOR PIPING FLEXIBILITY.)
3.
PROVIDE FIRM, LEVEL STABLE AND SMOOTH SURFACE FOR LOAD CELL
MOUNTING. LOAD CELLS MAY BE ROTATED TO SUIT CUSTOMER'S SPECIFIC
INSTALLATION. SHIM AS REQUIRED.
4.
FOR APPLICATIONS WHICH REQUIRE PERIODIC DEAD WEIGHT CALIBRATIONS,
WEIGH LIFTING LUGS (NOT PROVIDED BY CSMC) ARE TO BE PROVIDED ON
TANK.
5.
CONSULT FACTORY FOR SPECIAL APPLICATIONS AND/OR INSTALLATIONS.
6.
FOR SST10 INSTALLATIONS, REFERENCE DRAWING 1771-B280-GS,
HYDRAULIC LOAD CELL STAND DIMENSIONAL OUTLINE DRAWING.
FOR SST25 INSTALLATIONS, REFERENCE DRAWING 1771-B282-GS,
HYDRAULIC LOAD CELL STAND DIMENSIONAL OUTLINE DRAWING.
FOR SST50 INSTALLATIONS, REFERENCE DRAWING 1771-B230-0A, HYDRAULIC
LOAD CELL STAND DIMENSIONAL OUTLINE DRAWING.
FOR SST75 INSTALLATIONS, REFERENCE DRAWING 1771-B229-0A, HYDRAULIC
LOAD CELL STAND DIMENSIONAL OUTLINE DRAWING.
FOR SST100 INSTALLATIONS, REFERENCE DRAWING 1771-C320-0A,
HYDRAULIC LOAD CELL STAND DIMENSIONAL OUTLINE DRAWING.
7.
THE PURCHASER OF A FLOOR STAND TANK SCALE IS ADVISED TO INSTALL
SAFETY PIERS OR OTHER DEVICES BENEATH THE WEIGHBRIDGE/SCALE, TO
LIMIT MOVEMENT OF SCALE ASSEMBLY SHOULD ONE OR MORE SUPPORT
MEMBERS FAIL.
8.
CHECKS (NOT FURNISHED BY CSMC) ARE REQUIRED NEAR TOP OF TANKS
SUBJECTED TO LATERAL (OVERTURNING) FORCES. CSMC WILL NOT BE
RESPONSIBLE FOR THE STABILITY OF THE TANK.
1780-M057-O1 Rev C  Hydraulic Floor Stand Tank/Hopper

FINAL ASSEMBLY

9

Advertisement

Table of Contents
loading

Related Products for Cardinal GUARDIAN

Table of Contents