1. Upper tube
2. Rubber seal protruding out
12.
Align the upper tube holes to match the dimples
on the surface of the lower tube.
Note:
Ensure that the side profile appears as
shown in
Figure
Note:
Do not use the open hole near the
molded arrowheads.
1. Upper tube
2. Existing hole (bolt
removed)
13.
Using the existing holes in the upper tube as
a template, drill 2 holes, 6.5 mm (1/4 inch)
diameter, through the dimples on the lower tube
(Figure
31).
Figure 29
3. Bagger hood
30.
Figure 30
3. Notch at the bottom of the
tube when installed
4. Lower tube
g018440
Drilling Lower Discharge Tube
1. Dimples
2. Lower tube
g020776
3. Drill 6.5 mm (1/4 inch)
diameter hole
14.
Remove the upper and lower tubes from the
machine.
15.
Slide the tubes together and align the holes.
16.
Install the washers (1/4 inch) onto the bolts
(Figure
31).
17.
Using a hex key tool, install the screws (1/4 x
3/4 inch) and washers (1/4 inch) from the inside
of the lower tube and through the existing holes
in the upper tube
18
Figure 31
4. Upper tube
5. Install screw (1/4 x 3/4
inch), washer (1/4 inch),
and locknut (1/4 inch)
here.
6. Upper tube—existing
holes
(Figure
31).
g018439