2.
Remove the existing bolt and nut from the
mower deck
(Figure
Important:
For 48-inch and 60-inch mower
decks, there is only one bolt and nut that you
can remove.
For 54-inch mower deck, remove the bolt and
nut as shown in
Figure
Figure 9
1. Existing bolt
3.
Install the left side of the baffle using a carriage
bolt (5/16 x 3/4 inch) and flange nut (5/16 inch)
as shown in
Figure
4.
Loosen the 2 carriage bolts (5/16 x 3/4 inch) in
the baffle slots, and slide the baffle until the hole
aligns with the hole in the mower deck
10).
5.
Install baffle as shown in
Important:
Ensure that you use the correct
hole for the baffle; refer to
6.
Tighten the 2 carriage bolts (5/16 x 3/4 inch) in
the baffle slots
(Figure
9).
9.
2. Existing nut
10.
(Figure
Figure
10.
Figure
10.
10).
54-inch mower deck shown
1. Inner baffle
2. Hole for 48-inch and
60-inch mower deck
installation.
3. Hole for 54-inch mower
deck installation.
4. Right blade
g206498
5. Outer baffle
9
Figure 10
6. Install this carriage bolt
(5/16 x 3/4 inch) and
flange nut (5/16 inch) after
sliding the baffle.
7. Slots in the baffle
8. Loosen these 2 carriage
bolts (5/16 x 3/4 inch) and
2 flange nut (5/16 inch).
9. Install this carriage bolt
(5/16 x 3/4 inch) and
flange nut (5/16 inch) first.
g206496