Task flow navigation
3-slot Passport switch installation supporting information
•
"Unpacking a 3-slot Passport switch" (page 414)
•
"Installing a 13" termination panel in a 3-slot Passport switch"
(page 201)
•
"Installing a 3-slot Passport switch in a rack or cabinet" (page 207)
•
"Installing a 3-slot Passport switch in a seismic rack or cabinet"
(page 210)
•
"Installing a desk-top mounted 3-slot Passport switch" (page 234)
•
"Installing a vertical-mount 3-slot Passport switch" (page 252)
•
"Grounding a dc-powered 3-slot Passport switch" (page 192)
•
"Installing dc power cables in a 3-slot Passport switch" (page 268)
•
"Installing ferrite beads onto dc power cables" (page 283)
•
"Installing a control processor" (page 232)
•
"Installing a function processor" (page 237)
•
"Powering up a 3-slot Passport switch" (page 313)
•
"Installing FP cables" (page 278)
See the following sections:
•
"Site preparation" (page 53)
•
"Site preparation for a free-standing 3-slot or 5-slot Passport switch"
(page 41)
Passport 7400 Hardware Installation, Maintenance, and Upgrade 5.2S1
Chapter 1 3-slot Passport switch installation 31