Download Print this page

Toro 25427 Installation Instructions page 2

Back-up alarm kit rt1200 trencher

Advertisement

Installing the Alarm
1. Remove the existing bolts from the back of the
machine
(Figure
1).
2. Install the alarm to the bracket with 2 bolts (M6-1 x 20)
and 2 nuts (M6-1)
3. Apply thread-locking compound onto the existing
bolts
(Figure
1).
4. Install the bracket to the rear of the machine with the
existing bolts
(Figure
1. Bracket
2. Alarm
3. Nut (M6-1)
4. Left rear of the machine
(Figure
1).
1).
g028939
Figure 1
5. Existing bolts
6. Bolt (M6-1x20)
7. Wire harness
Installing the Wire Harness
1. Remove the four bolts securing the kick plate to the
frame and remove the plate
1. Kick plate
2. Remove the four bolts securing the foot plate to the
frame and remove the plate
1. Foot plate
3. Install the wire harness to the alarm
4. Route the harness under the cab and up to the area
under the steering column
2
(Figure
2)
Figure 2
(Figure
3).
Figure 3
(Figure
1).
(Figure
4).

Advertisement

loading

This manual is also suitable for:

25427e