Advertisement

Quick Links

HES350
(VB00020 model)
CONTACT LOCAL BUILDING OR FIRE OFFICIALS ABOUT RESTRICTIONS AND INSTALLATION INSPECTION REQUIREMENTS
IN LOCAL AREA.
READ THIS ENTIRE MANUAL BEFORE INSTALLATION AND USE OF THIS WOOD STOVE. FAILURE TO FOLLOW THESE
INSTRUCTIONS COULD RESULT IN PROPERTY DAMAGE, BODILY INJURY OR EVEN DEATH.
READ AND KEEP THIS MANUAL FOR REFERENCE
Printed in Canada
Wood Stove
Owner's Manual
Part 2 of 2
INSTALLATION AND OPERATION
US Environmental Protection Agency
phase II certified wood stove compliant
with 2020 cord wood standard
Safety tested according to ULC S627,
UL 1482 and UL 737 standards by an
REQUIREMENTS
accredited laboratory.
MOBILE
HOME
46256_IA
2022-10-12

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the HES350 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Ventis HES350

  • Page 1 Wood Stove Owner's Manual Part 2 of 2 INSTALLATION AND OPERATION HES350 REQUIREMENTS (VB00020 model) US Environmental Protection Agency phase II certified wood stove compliant with 2020 cord wood standard Safety tested according to ULC S627, UL 1482 and UL 737 standards by an accredited laboratory.
  • Page 2 Dealer: Installer: Phone Number: Serial Numbrer: ONLINE WARRANTY REGISTRATION If the unit requires repairs during the warranty period, proof of purchase must be provided. The purchase invoice must be kept. The date indicated on it establishes the warranty period. If it can not be provided, the warranty period will be determined by the date of manufacture of the product.
  • Page 3: Table Of Contents

    6.7 Mobile Home Installation ....................30 7. Maintenance/Parts Replacement ..................31 7.1 Replacement ........................31 7.2 Gasket ..........................32 7.3 Door ..........................32 8. Exploded Diagram and Parts List ..................35 9. VENTIS LIMITED LIFETIME WARRANTY ................38 Installation and Operation Requirements - HES350 Page 3...
  • Page 4: Certification Plate

    1. CERTIFICATION PLATE Page 4 Installation and Operation Requirements - HES350...
  • Page 5: General Information

    This appliance is officially tested and certified by an independent agency. Tested and certified in compliance with CFR 40 part 60, subpart AAA, section 60.534(a)(1(ii) and ASTM E3053. Based on ALT-125 sent by EPA on February 28, 2018. Carbon monoxide. Installation and Operation Requirements - HES350 Page 5...
  • Page 6: Specifications

    CAN/CSA- Z240 MH standard. Tested and certified in compliance with CFR 40 part 60, subpart AAA, section 60.534(a)(1(ii) and ASTM E3053. Based on ALT-125 sent by EPA on February 28, 2018. Page 6 Installation and Operation Requirements - HES350...
  • Page 7: Dimensions

    6" 153mm Figure 1: Top View 30 5/8" 776mm 24 1/4" 615mm 11 1/2" 291mm 18 3/8" 467mm 22 1/4" 566mm 24 1/8" 613mm Figure 2: Front View Figure 3: Side View Installation and Operation Requirements - HES350 Page 7...
  • Page 8 236mm 19" 483mm Figure 4: Door Opening 5/16" 3/16" 22 7/8" 12 3/4" 581mm 323mm 20 1/8" 510mm Figure 5: Front View - Combustion Chamber Figure 6: Side View - Combustion Chamber Page 8 Installation and Operation Requirements - HES350...
  • Page 9: Epa Loading

    For better results, close the air control gradually from the closing of the door to the complete closing of the air control. Installation and Operation Requirements - HES350 Page 9...
  • Page 10 2.4.4 Logs placement The images below show how to place the logs in the combustion chamber as described previously. SECTION E SECTION E-E Page 10 Installation and Operation Requirements - HES350...
  • Page 11: Clearances To Combustible Material

    17 ¾" (451 mm) 17 ¾" (451 mm) The pipe distances listed in this table refer to the distances obtained when the stove is installed in accordance with the appliance clearances above mentioned. Installation and Operation Requirements - HES350 Page 11...
  • Page 12 48" Flush 48" 36" 122 cm 92 cm Figure 7: Clearances - Top Figure 8: Clearances - Corner 84" 213 cm Figure 9: Clearances - Side Page 12 Installation and Operation Requirements - HES350...
  • Page 13 6" from combustible materials must be used. Only in this case, the same clearances as a certified double wall pipe connector can be used. The pipe distances listed in this table refer to the distances obtained when the stove is installed in accordance with the appliance clearances above mentioned. Installation and Operation Requirements - HES350 Page 13...
  • Page 14 20 ¾" (527 mm) 20 ¾" (527 mm) The pipe distances listed in this table refer to the distances obtained when the stove is installed in accordance with the appliance clearances above mentioned. Page 14 Installation and Operation Requirements - HES350...
  • Page 15 The pipe distances listed in this table refer to the distances obtained when the stove is installed in accordance with the appliance clearances above mentioned. Installation and Operation Requirements - HES350 Page 15...
  • Page 16 20 ¾" (527 mm) 20 ¾" (527 mm) The pipe distances listed in this table refer to the distances obtained when the stove is installed in accordance with the appliance clearances above mentioned. Page 16 Installation and Operation Requirements - HES350...
  • Page 17 36" 122 cm 92 cm Les distances de tuyau listées dans ce tableau se réfèrent aux distances obtenues lorsque le poêle est installé en accord avec les dégagements de l’appareil mentionnés ci-dessus. Installation and Operation Requirements - HES350 Page 17...
  • Page 18: Floor Protection

    The floor protection at the back of the stove is limited to the stove’s required clearance if such clearance is smaller than 8 inches (203 mm). Only required under the horizontal section (Ho) of the connector. Must exceed each side of the connector by at least 2 inches (51 mm). Page 18 Installation and Operation Requirements - HES350...
  • Page 19 84" 213 cm Installation and Operation Requirements - HES350 Page 19...
  • Page 20: Reducing Wall And Ceiling Clearances Safely

    Mounting hardware must not be located closer than 8" (200 mm) from the vertical centre line of the appliance. G) Edge clearance for ceiling shields to side and back walls: 3" (75 mm) Shield extension beyond each side of the appliance: 18" (450 mm) Page 20 Installation and Operation Requirements - HES350...
  • Page 21 Figure 11: Heat shield clearances Figure 12: Heat shield clearances Figure 13: Heat shield clearances Figure 14: Heat shield clearances Installation and Operation Requirements - HES350 Page 21...
  • Page 22 Brick, with a minimum of 24 gauge (0.61 mm) sheet metal backing, spaced out at least 1" (25 mm)* by non-combustible spacers 12" (305 mm) * In Canada this space can be ⅞" (21 mm) Page 22 Installation and Operation Requirements - HES350...
  • Page 23: Installation Of Options On Your Product

    THE IMAGES SHOWN ARE FOR GUIDANCE ONLY AND MAY BE DIFFERENT FROM YOUR PRODUCT, BUT THE ASSEMBLY REMAINS THE SAME. To remove the decorative panel (A), remove the screws (B) and push forward on the panel to unhook it from the bracket (C). Installation and Operation Requirements - HES350 Page 23...
  • Page 24: Optional Fresh Air Intake Kit Installation

    (HVAC type, must meet ULC S110 or UL 181 class 0 or class 1) (B), sold separately. Refer to air intake kit installation instructions for more details. Installation with pedestal Page 24 Installation and Operation Requirements - HES350...
  • Page 25: Optional Fire Screen Installation

    Lift the fire screen upwards and push the bottom part towards the stove then let the fire screen rest on the bottom of the door opening. Warning: Never leave the stove unattended while in use with the fire screen. Installation and Operation Requirements - HES350 Page 25...
  • Page 26: Optional Blower And Thermodisc Installation

    Ensure that the blower’s power cord is not in contact with any surface of the stove to prevent electrical shock or fire damage. Do not run the power cord beneath the stove. Page 26 Installation and Operation Requirements - HES350...
  • Page 27: Air Tubes And Baffle Installation

    Put the baffle in place. Repeat steps 1 and 2 for the three other tubes. To remove the tubes use the above steps in reverse order. Installation and Operation Requirements - HES350 Page 27...
  • Page 28 Note that secondary air tubes (B) can be replaced without removing the baffle board (A) and that all tubes are not necessarely identical (look at the part number on the tube). Page 28 Installation and Operation Requirements - HES350...
  • Page 29: Log Retainers Installation

    Log Retainers Installation 2" 2" Installation and Operation Requirements - HES350 Page 29...
  • Page 30: Mobile Home Installation

    Mobile Home Installation THE IMAGES SHOWN ARE FOR GUIDANCE ONLY AND MAY BE DIFFERENT FROM YOUR PRODUCT, BUT THE ASSEMBLY REMAINS THE SAME. Screw the base on the floor with the proper hardware. Page 30 Installation and Operation Requirements - HES350...
  • Page 31: Maintenance/Parts Replacement

    Reinstall the glass, being careful to centre the glass in the door and not to over-tightening the retaining screw. The two main causes of broken door glass are uneven placement in the door and over-tightening the retaining screws. Installation and Operation Requirements - HES350 Page 31...
  • Page 32: Gasket

    Remove the split pin by pulling and turning it using pliers. Turn the handle one counterclockwise turn to increase pressure. Reinstall the split pin with a small hammer. Figure 15: Removing the split pin Figure 16: Installing the split pin Page 32 Installation and Operation Requirements - HES350...
  • Page 33 Using a flat screwdriver, turn the adjustable hinge rods in the direction shown to adjust the doors. Tighten all door hinge pressure screws when they are at the desired positions. Configurations 1-2-3-4-5-6, show in which direction these act on the adjustment of the door. Installation and Operation Requirements - HES350 Page 33...
  • Page 34 Leave about ½" long of the gasket when cutting and press the end into the groove. Tuck any loose fibers under the gasket and into the silicone. Close the door. Do not use the stove for 24 hours. Page 34 Installation and Operation Requirements - HES350...
  • Page 35: Exploded Diagram And Parts List

    8. Exploded Diagram and Parts List Installation and Operation Requirements - HES350 Page 35...
  • Page 36 AC02055 QUICK CONNECT THERMODISC 44028 CERAMIC THERMODISC F110-20F PL05530-02 THERMODISC BOX (COVER) 60013 POWER CORD 96" X 18-3 type SJT (50 pcs per carton) SE53560 130 CFM BLOWER WITH VARIABLE SPEED CONTROL Page 36 Installation and Operation Requirements - HES350...
  • Page 37 4 1/2" X 9" X 1 1/4" REFRACTORY BRICK 29015 4" X 9" X 1 1/4" REFRACTORY BRICK PL36760 3 1/4" X 4 1/2" X 1 1/4" REFRACTORY BRICK SE74167 DOOR HINGE REPLACEMENT KIT Installation and Operation Requirements - HES350 Page 37...
  • Page 38: Ventis Limited Lifetime Warranty

    Labour cost and repair work to the account of the manufacturer are based on a predetermined rate schedule and must not exceed the wholesale price of the replacement part. Shall your unit or a components be defective, contact immediately your VENTIS dealer. To accelerate processing of your warranty claim, make sure to have on hand the following information when calling:...
  • Page 39 Installation and Operation Requirements - HES350 Page 39...
  • Page 40 This document is available for free download on the Stove Builder International inc. manufacturer’s website. It is a copyrighted document. 250, rue de Copenhague, Resale is strictly prohibited. The manufacturer may update St-Augustin-de-Desmaures (Québec) Canada this document from time to time and cannot be responsible G3A 2H3 for problems, injuries, or damages arising out of the use 1-877-356-6663...

This manual is also suitable for:

Vb00020

Table of Contents