Download Print this page

Viking Northern Exposure Assembly Instructions page 3

Futon

Advertisement

Northern Exposure Futon Assembly Instructions
STEP 4:
Set the back deck between the arms with the slats facing
front. Install back deck by inserting hardwood pegs into
the angled slots of both arms. Once this has been
completed, all 6 bolts should be tightened tight. See
diagram 4.
STEP 5:
Position the seat deck between the arms. With the slats
facing up, align the holes at the end of the seat deck with
the holes at the end of the back deck. Insert clevis pins
from the outside of the frame to the inside. Put a washer
at the end of the clevis pin and install a hairpin on the
end of the clevis pin. See diagram 5.
STEP 6:
Take the 2 ¾" clevis pin and thread it through the return mechanism with washers on both sides. Install it in the
remaining hole in the seat section, placing another washer on the end before inserting the hairpin. See diagram 6. Make
sure the wood dowel is pointing toward the futon. Do this on both sides. These blocks will make the futon front-operated.
2 ¾" Clevis Pin
Return Mechanism
Washer
Diagram 5
Line up holes in seat and back section
Seat Deck
Washer
3
Wood Pegs go into angled slots.
Diagram 4
Diagram 6
Hairpin
Washer

Advertisement

loading