Energizing Protection Relay - ABB RELION REX610 Installation Manual

Hide thumbs Also See for RELION REX610:
Table of Contents

Advertisement

2NGA000821 A
5.9
REX610
Installation Manual
See the technical, engineering and operation manuals for
details on features supported by the USB based connectivity
and the USB based power-up.

Energizing protection relay

Before connecting the auxiliary power, check that the protective
film is removed from top of the protection relay.
Before connecting the auxiliary power, check that the terminal strip is wired
and placed correctly.
Remove the protective film from the top side of the unit. Check that there is no
debris visible in the ventilation holes.
GUID-79A04A4C-9540-4E82-BDAB-55902BC65D70 V1 EN-US
Figure 29:
Removing the protective film
1.
Green Normal LED starts to flash.
2.
LCD lights up and IED start-up is displayed.
3.
The main menu is displayed. A steady green Normal LED indicates a
successful start-up.
Section 5
Connecting
43

Advertisement

Table of Contents
loading

Table of Contents