Install The Gateway - Taylor -GTW-2A Installation Manual

Table of Contents

Advertisement

O
T I M U S
S O R T E R S

5.2 Install the gateway.

Warning:
-
Obey the safety instructions of the
inverter.
-
Make sure that the inverter is off and de-
energized.
-
Do not connect more than one string of
solar panels to a MPPT connection.
-
Do not connect parallel module strings
per MPPT tracker
1.
Scan the gateway. Select the 'SCAN
GTW' button (A).
Note: If necessary, drill holes. Drill
safely. Do not drill or screw in electricity
lines, water pipes, and such items. Use
the correct type of wall plugs.
2.
Install the fasteners. Use the drill
template on the last page of this
manual.
3.
Attach the gateway to the fasteners (B).
2022-012-R-0017-A2_Draft 4
3
11
8
6
3
4
B
5
Gateway
10
9
7
5
4
2
1
A
8
9

Advertisement

Table of Contents
loading

Table of Contents