5 Installation

5.1 Preliminary requirements
1.
Scan the barcode of each individual
solar panel. In the onboarding
application on your mobile device, On
the 'Scan' screen (A), select the 'Scan'
button (B).
2.
The solar panels (A) are installed and
the smart modules (B) are connected.
3.
The inverter is installed.
Warning:
-
Obey the instructions that come with the
solarpannels, the smart modules and the
inverter.
-
When the photovoltaic array is exposed
to light, it supplies a DC voltage.
Design rules
-
Multiple orientations within one string are allowed
-
Each orientation should reach the start-up voltage (input DC)
2
2022-012-R-0017-A2_Draft 4
4
2
9
B
XXXXXXXXX
A
1
- +
A
B
2
Gateway
3
1
10
- +
7
8