Page 1
Zhejiang Province, 310000 P.R. CHINA No part of this document may be reproduced or transmitted in any form or by any means without prior written consent of SolaX Power Technology (Zhejiang) Co., Ltd. (hereinafter referred to as Tel.: +86 (0) 571-5626 0011 SolaX).
DISCLAIMER ............53 WARRANTY REGISTRATION FORM Note: There are 3 models of T-BAT system, which includes the BMS, battery module(s) and base. Refer to section 3.3.1 T-BAT-SYS-HV Configuration List on Page 11 for detailed models. Target Group This manual is for qualifiedelectricians. The tasks described in this manual may only be performed by qualified electricians.
2. Safety 2. Safety Safety 2.1.2 Explanation of Symbols Safety Instructions Symbol Explanation For safety reasons, installers are responsible for familiarizing themselves with the contents of this manual and all warnings before performing installation. CSA mark for UL1973 2.1.1 General Safety Precautions 272687 WARNING! CE mark of conformity...
WARNING! the electrolyte solution and the gas that may be generated by it. Direct contact may All operations of T-BAT-SYS-HV relating to electrical connection and lead to skin irritation or chemical burns. If the user comes into contact with the installation must be carried out by qualified personnel.
3. Product Infromation 3. Product Information Appearance Product Information Section View of BMS Ÿ Dimensions and Weight Right A battery management system (BMS) is an electronic system that manages a rechargeable battery. A battery module is a type of electrical battery which can charge or discharge loads.
Section view of battery module Ÿ 3.2.1 Features The T-BAT-SYS-HV, adopting advanced technology and having the characteristics of high reliability and convenient to control, is one of the most advanced energy storage systems in today's market, with details as below: 90% DOD Ÿ...
When assembling the system, avoid touching the battery terminals with any metal TBMS-MCS60060×1 T-BAT H 10.0 TP-HS50 × 2 90-116 object or bare hands. According to the design principles, T-BAT-SYS-HV will TP-HS50 × 3 T-BAT H 15.0 TBMS-MCS60060×1 135-174 provide a safe and reliable energy. Improper operation and equipment damage may 180-232 cause overheating and electrolyte leakage.
4. Preparation before Installation 4. Preparation before Installation Safety Gear Inspection Installation and maintenance personnel must strictly comply with the applicable 4.4.1 Check for Transport Damage federal, state, and local regulations as well as industry standards on product installation. To avoid short circuit and personal injury, respirator, gloves, goggles and Ensure that the battery has been received in good condition.
4. Preparation before Installation 4. Preparation before Installation All Accessories Required for Two Installation Modes 4.4.3 Accessory BMS (TBMS-MCS60060): Accessories included are shown as follows: Item Description Quantity User Manual Safety Instructions OneBattery Module (TP-HS50×1): Accessories included are shown as follows: Item Description Quantity...
5. Installation 5. Installation Installation Floor Mounting 5.1 Installation Environment Requirements 5.3.1 Overview There are three schemes available for users. ● Ensure that the equipment is installed in a well ventilated environment. Scheme A ● To prevent fire due to high temperature, ensure that the ventilation vents or heat dissipation system are not blocked when the equipment is running.
Page 13
5. Installation 5. Installation 5.3.2 Step Step 2: Locate the Base 1.57 in./40 mm away from the wall, accurately mark the location of the Base on both sides with a pen. Please reserve enough distance from the equipment to the ceiling/ground for capacity expansion.
Page 14
5. Installation 5. Installation (3) Fix the Platen (2 holes) using M5 * 10 Phillips-head screw, and secure M5*10 Step 5: screws (2) to connect Base and Battery Module (Torque: 1.0 N·m). (1) Attach M5 * 10 screw to Wall Bracket but be sure not to tighten; (2) Place such Wall Bracket to the wall, align its holes to the holes on the Battery Module, and use a spirit level to measure the Wall Bracket to ensure it's even;...
Page 15
5. Installation 5. Installation Step 8: Place the fourth battery module. Step 6: Place Expansion Bolts into the two holes (the Expansion Bolt is not required in case of solid wood wall). Let the Platen down Step 7: Place the Wall Bracket on the wall where the mark is drawn previously, and then secure the Wall Brackets on the wall using Tapping Screws and Gaskets.