Download Print this page

Verkada CH52-E Install Manual page 16

Multisensor camera

Advertisement

Appendix
CH52-E Compliance
Caution
Note: This equipment has been tested and found to comply with the limits for a Class B digital device, pursuant
to part 15 of the FCC Rules. These limits are designed to provide reasonable protection against harmful
interference in a residential installation. This equipment generates, uses and can radiate radio frequency
energy and, if not installed and used in accordance with the instructions, may cause harmful interference to
radio communications. However, there is no guarantee that interference will not occur in a particular
installation. If this equipment does cause harmful interference to radio or television reception, which can be
determined by turning the equipment off and on, the user is encouraged to try to correct the interference by
consulting the dealer or an experienced radio/TV technician for help.
PoE
To reduce potential safety issues, only use the PoE adapter provided with the product, a replacement PoE
adapter provided by Verkada, or a PoE adapter purchased as an accessory from Verkada.
Adapter
16
1.
Maintenance and repair work must always be carried out by qualified technical personnel.
Disconnect power from the unit when performing a maintenance task.
2.
Wiring methods used for the connection of the equipment to earth shall be in accordance with the
National Electrical Code, ANSI/NFPA 70, and the Canadian Electrical Code, Part 1, CSA C22.1.
3.
The product must be installed and protected in a location that is not easily accessible and is away
from impacts or heavy vibration.
4.
The device is only to be connected to PoE networks without routing to outside plants.
5.
If powered by a power adapter, the adapter should be properly grounded.
6.
Please contact certified dealers for power adapters.
Verkada Inc. 405 E 4th Ave, San Mateo, CA 94401
sales@verkada.com
All specifications are subject to change without notice
Copyright © Verkada Inc. All rights reserved.

Advertisement

loading