IBM AS/400e 270 Upgrade page 10

Upgrading the system unit from twinaxial console to operations console (feature 5544)
Hide thumbs Also See for AS/400e 270:
Table of Contents

Advertisement

__ 8. Select Start a service tool and press Enter.
__ 9. Select Operator panel functions and press Enter.
__ 10. Select the function key to power off the system (F10).
__ 11. Press Enter to confirm that you want to power down.
__ 12. Power off and unplug attached workstations and printers.
Connecting the Operations Console cable
__ 1. Remove the system unit back cover.
__ 2. Attach the disposable wrist strap to prevent electrostatic discharge from
__ 3. If you have a 270 System Unit, locate position C07. See "PCI card locations"
__ 4. If you have a 820 System Unit, locate position C06. See "PCI card locations"
4
AS/400e 270 or 820: Upgrading the System Unit from Twinaxial Console to Operations Console (Feature 5544)
__ a. Place your hand near the bottom of the back cover and lift up and
out.
__ b. Attention: If removing side cover while powered on, errors may
occur due to electromagnetic interference.
damaging a device. Attach the adhesive part of the foil to an unpainted
surface.
on page 13 for more information.
on page 13 for more information.

Advertisement

Table of Contents
loading

This manual is also suitable for:

As/400e 820

Table of Contents