NC ENGINEERING MKII 600 Series Operating, Maintenance And Safety Instructions page 75

Dump trailer
Table of Contents

Advertisement

The Purchaser shall not without prior written consent of the Company: ‐ 
(A) Permit the operation of any item of equipment by any person other than by operators
employed by or under the direction of the Purchaser or by representatives of the
Company or person authorised in writing by the Company.
(B) Permit the alteration addition or attachment to or movement of any item of equipment.
(C) Permit any item of the equipment to be commissioned unless the Company's
representative is in attendance or has been given notice of the proposed use.
(D) Assign or transfer any of his interest under this agreement.
8. The agreement contained in this document compromises the whole of the Agreement
between the parties hereto and supersedes all previous agreements between the parties
with respect of the equipment specified in this agreement and no other terms and
conditions (including any written on or attached to any purchase order document or
correspondence) shall be included or implied unless agreed upon in writing by an authorised
officer or representative of each of the parties to this agreement.
9. This agreement shall be subject and construed in accordance with Northern Ireland law.
75

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mkii dt612Mkii dt614Mkii dt616

Table of Contents