Daikin CTXF20C5V1B Installation Manual
Hide thumbs Also See for CTXF20C5V1B:
Table of Contents

Advertisement

Quick Links

Installation manual
Daikin room air conditioners
CTXF20C5V1B
Installation manual
CTXF25C5V1B
English
Daikin room air conditioners
CTXF35C5V1B

Advertisement

Table of Contents
loading

Summary of Contents for Daikin CTXF20C5V1B

  • Page 1 Installation manual Daikin room air conditioners CTXF20C5V1B Installation manual CTXF25C5V1B English Daikin room air conditioners CTXF35C5V1B...
  • Page 2 3P516375-15N...
  • Page 3: Table Of Contents

    To perform a test run..............13 Daikin website (publicly accessible). 10.2.1 To perform a test run in winter season ....... 13 ▪ The full set of latest technical data is available on the Daikin 11 Disposal Business Portal (authentication required). 12 Technical data 12.1...
  • Page 4 A phase advancing capacitor will reduce performance and may DANGER: RISK OF EXPLOSION cause accidents. Do NOT start the unit if it is vacuumed. Installation manual CTXF20~35C5V1B Daikin room air conditioners 3P519299-13V – 2020.08...
  • Page 5: About The Box

    Do NOT insert fingers, rods or other objects into the air ▪ Indoor humidity: ≤80% inlet or outlet. Do NOT remove the fan guard. When the fan is rotating at high speed, it will cause injury. CTXF20~35C5V1B Installation manual Daikin room air conditioners 3P519299-13V – 2020.08...
  • Page 6: Unit Installation

    Unit installation Preparing the installation site WARNING Make sure installation, servicing, maintenance and repair comply with instructions from Daikin and with applicable legislation (for example national gas regulation) and are executed only by authorised persons. WARNING Front panel shaft The appliance shall be stored so as to prevent mechanical 5.2.2...
  • Page 7: To Remove The Electrical Wiring Box Cover

    4 Finish the installation by securing the mounting plate on the wall using M4×25L screws (field supply). INFORMATION The removed pipe port cover can be kept in the mounting plate pocket. CTXF20~35C5V1B Installation manual Daikin room air conditioners 3P519299-13V – 2020.08...
  • Page 8: To Provide Drainage

    (nominal Ø13  mm) directly to the drain hose as with embedded piping work, use a field supplied drain socket (nominal Ø13 mm). Installation manual CTXF20~35C5V1B Daikin room air conditioners 3P519299-13V – 2020.08...
  • Page 9: Piping Installation

    ▪ ALWAYS use a spanner and torque wrench together to tighten the flare nut when connecting the piping. This to prevent nut cracking Class L1 liquid piping L1 gas piping and leaks. 20~35 Ø6.4 Ø9.5 CTXF20~35C5V1B Installation manual Daikin room air conditioners 3P519299-13V – 2020.08...
  • Page 10: To Connect The Refrigerant Piping To The Indoor Unit

    ▪ Do NOT use locally purchased electrical parts inside the product. ▪ Do NOT branch the power supply for the drain pump, etc. from the terminal block. This could result in electrical shock or fire. Installation manual CTXF20~35C5V1B Daikin room air conditioners 3P519299-13V – 2020.08...
  • Page 11: Specifications Of Standard Wiring Components

    Provide adequate measures to prevent that the unit can be mounting plate. used as a shelter by small animals. Small animals that make contact with electrical parts can cause malfunctions, smoke or fire. CTXF20~35C5V1B Installation manual Daikin room air conditioners 3P519299-13V – 2020.08...
  • Page 12: To Fix The Unit On The Mounting Plate

    In case 2 indoor units are installed in 1 room, different addresses for After cutting with nippers 2 user interfaces can be set. 1 Remove the batteries from the user interface. 2 Cut the address jumper. Installation manual CTXF20~35C5V1B Daikin room air conditioners 3P519299-13V – 2020.08...
  • Page 13: Commissioning

    There are NO damaged components or squeezed pipes on the inside of the indoor and outdoor units. There are NO refrigerant leaks. The correct pipe size is installed and the pipes are properly insulated. CTXF20~35C5V1B Installation manual Daikin room air conditioners 3P519299-13V – 2020.08...
  • Page 14: Technical Data

    ▪ A subset of the latest technical data is available on the regional monitor green) Daikin website (publicly accessible). HIGH VOLTAGE High voltage ▪ The full set of latest technical data is available on the Daikin Intelligent eye sensor Business Portal (authentication required). IPM* Intelligent power module...
  • Page 15 12 Technical data Symbol Meaning Terminal strip (block) Electronic expansion valve coil Y*R, Y*S Reversing solenoid valve coil Ferrite core ZF, Z*F Noise filter CTXF20~35C5V1B Installation manual Daikin room air conditioners 3P519299-13V – 2020.08...
  • Page 16 DAIKIN ISITMA VE SOĞUTMA SİSTEMLERİ SAN.TİC. A.Ş. Gülsuyu Mahallesi, Fevzi Çakmak Caddesi, Burçak Sokak, No:20, 34848 Maltepe İSTANBUL / TÜRKİYE Tel: 0216 453 27 00 Faks: 0216 671 06 00 Çağrı Merkezi: 444 999 0 Web: www.daikin.com.tr 3P519299-13V 2020.08 Verantwortung für Energie und Umwelt...

This manual is also suitable for:

Ctxf25c5v1bCtxf35c5v1b

Table of Contents