Harol SC1000 Installation Instructions Manual

Integral screen

Advertisement

Quick Links

INTEGRAL SCREEN
SC1000
art.nr. 062637
POORTEN
ROLLUIKEN
GATES
ROLLER SHUTTERS
INSTALLATION INSTRUCTIONS
ZONWERING
SUN PROTECTION

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SC1000 and is the answer not in the manual?

Questions and answers

Summary of Contents for Harol SC1000

  • Page 1 INSTALLATION INSTRUCTIONS INTEGRAL SCREEN SC1000 art.nr. 062637 POORTEN ROLLUIKEN ZONWERING GATES ROLLER SHUTTERS SUN PROTECTION...
  • Page 2: Table Of Contents

    INSTALLATION INSTRUCTIONS INTEGRAL SCREEN SC1000 ENVIRO TABLE OF CONTENTS 1. INTRODUCTION 2. GENERAL WARNINGS 3. LIST OF TOOLS REQUIRED 4. INSTALLATION STEPS 4.1. Check the package 4.2. Check the product 4.3. Check the height and width 4.4. The actual assembly in 4 steps 4.5.
  • Page 3: Introduction

    INSTALLATION INSTRUCTIONS INTEGRAL SCREEN SC1000 ENVIRO 1. INTRODUCTION The SC1000 ENVIRO screen is a flat hanging sun protection screen, which is placed in front of the window with a ’zipper system’ on each side of the fabric. This makes the screen particularly resistant to high winds and keeps the fabric perfectly in place.
  • Page 4 Make sure the screen box can always be opened so the mechanical parts inside can be reached easily. If these rules are not respected, Harol cannot be held responsible for the cost of demolition work or any paint work or wallpapering.
  • Page 5: Check The Package

    INSTALLATION INSTRUCTIONS INTEGRAL SCREEN SC1000 ENVIRO 4. MONTAGESTAPPEN 4.1. Check the package Check the package for any damage before removing the complete packaging from around the box and guide rails. 4.2. Check the product Check the product: ensure all guide rails and clip profiles are included and check if each guide rail contains a holder with zipper profile.
  • Page 6: The Actual Assembly In 4 Steps

    INSTALLATION INSTRUCTIONS INTEGRAL SCREEN SC1000 ENVIRO 4.4. The actual assembly in 4 steps 03/15 | 6 Fig.2 Step 1 • The guide rails are supplied already assembled. The cover must be removed from the base section before it is tted on to the window. Z i pper guide and sleeve can remain in the cover.
  • Page 7 INSTALLATION INSTRUCTIONS INTEGRAL SCREEN SC1000 ENVIRO Step 2 • Mount the base of the guide rail against the window with the screws supplied. Fig.5 Fig.6 GUIDE RAIL 1040 = SURFACE MOUNTED GUIDE RAIL 1120 DIN 7504N 4,8 x 25 MM...
  • Page 8 INSTALLATION INSTRUCTIONS INTEGRAL SCREEN SC1000 ENVIRO 1120 Option A2 6 5 6 Ad j u st men t p ro f i l e • The guide rails are supplied already assembled. The adjustment profile must be removed from the base section.
  • Page 9 INSTALLATION INSTRUCTIONS INTEGRAL SCREEN SC1000 ENVIRO Option Please note that only the adjustment profile should be screwed on to the window. The base is then fitted to the adjustment profile using a A2 6 5 6 click connection. Ad j u st m e n t p ro f i l e Fig.12...
  • Page 10 INSTALLATION INSTRUCTIONS INTEGRAL SCREEN SC1000 ENVIRO GUIDE RAIL 1040 Option A2 6 5 6 Use the same surface mounting of the guide rail on the window as for guide rail 1120. This guide rail is supplied with pre-assembled mounting. Clip the guide rail onto the...
  • Page 11 INSTALLATION INSTRUCTIONS INTEGRAL SCREEN SC1000 ENVIRO Step 3 • Follow the same procedure to install the other guide rail. Box width Fig.17 Fig.18 distance between guide rails = box width - 80 mm Make sure that the screens are always dead level and installed perfectly square.
  • Page 12 INSTALLATION INSTRUCTIONS INTEGRAL SCREEN SC1000 ENVIRO Step 4 • After both guide rails have been mounted on the window, lower the entire box on to the guide rails (Fig. 19). Make sure the pins of the side console fit into the guide rail (Fig.
  • Page 13: Checking For Squareness

    INSTALLATION INSTRUCTIONS INTEGRAL SCREEN SC1000 ENVIRO 4.5. Checking for squareness Make sure that the screens are always dead level and installed perfectly square. This can be checked and corrected in one way only. Check first whether the whole assembly is mounted dead level.
  • Page 14: Service

    INSTALLATION INSTRUCTIONS INTEGRAL SCREEN SC1000 ENVIRO 5. SERVICE - OPENING BOX • Roll up the fabric, so that the bottom lath is in its highest position - in the box. • Remove the two screws that connect the base plate to the box.
  • Page 15 INSTALLATION INSTRUCTIONS INTEGRAL SCREEN SC1000 ENVIRO • Remove the cover from the lateral guide. This is held in place by clips. Fig.29 • The slide module is held in place by two screws on each side of the box. Unscrew these and remove the stop plate.
  • Page 16 INSTALLATION INSTRUCTIONS INTEGRAL SCREEN SC1000 ENVIRO Safety ! Depress to unlock Fig.32 • Unlock the slides and gradually lower the slide module (Fig. 31). • Halfway down, make a rotating movement (Fig. 32) to release the slide module from the guide rails.
  • Page 17: Electrical Connections

    INSTALLATION INSTRUCTIONS INTEGRAL SCREEN SC1000 ENVIRO 6. ELECTRICAL CONNECTIONS Note: The connections must be carried out by a registered installer (refer to guarantee card 2.1.) Electrical installation and connection diagrams must be applied correctly, the electrical accessories employed must comply with the current standards and/or requirements.
  • Page 18: Adjusting The Motor - Limit Switches

    INSTALLATION INSTRUCTIONS INTEGRAL SCREEN SC1000 ENVIRO Why use an RI2 relay box? If several LT or LS motors are operated using the same switch, you must always use a relay box. If relay boxes are not used, the integral limit switches will soon burn out due to the high inductive and capacitive voltages which are mutually generated.
  • Page 19: Troubleshooting And Repairs

    INSTALLATION INSTRUCTIONS INTEGRAL SCREEN SC1000 ENVIRO 7. TROUBLESHOOTING AND REPAIRS 7.1. The screen will not roll up or down. • The internal limit switch of the motor has not been activated in any direction. Press both setting buttons and proceed with the setting of the end positions.
  • Page 20: Dismantling And Removal

    INSTALLATION INSTRUCTIONS INTEGRAL SCREEN SC1000 ENVIRO 7.12. Dismantling and removal • The screen must only be dismantled by qualified staff. • Make sure the power is off before dismantling the box. • Ensure there is adequate lighting when carrying out the work.
  • Page 21: Notes

    INSTALLATION INSTRUCTIONS INTEGRAL SCREEN SC1000 ENVIRO 8. NOTES 03/15 | 21...