Tipping Machine; Authorized Service Center, Or The Manufacturer About How To Proceed; Operation; Starting - NTC RZ120 Operation Manual

Asphalt and concrete cutters
Table of Contents

Advertisement

Asphalt and concrete cutters

3.5 Tipping machine

Tipping machine when the machine tipped over may break of oil into the carburetor, or the plunger.
Therefore, we recommend to inform the authorized service center, or the manufacturer about how to
proceed.
4.

OPERATION

4.1. Starting

4.1.1. Gasoline Engines HONDA
1. Turn the fuel tap into the ON position.
2. Turn on the electric switch of ignition.
3. Engage the choke („CHOKE"). Do not use it
at warm engine or at high ambient
temperature.
1.
Adjust the throttle control lever to idle.
Page 15
5. Pull out the starter grip slowly till some
resistance is felt, then pull vehemently. Do
not release the grip, but return it slowly into
the original position.
6. Let the engine to warm up, then disengage
the choke.
7. Let the engine to run at idle for a while
before loading.
8. For cutting, shift the throttle control lever to
fully open position.
DANGER!
The spindle and the cutting disc begins to
rotate
immediately.
revolving disc would not cause any danger
for the bystanders. Have the disc cover closed
before starting. When using SUBARU engine,
proceed
according
manual.
Operation manual
Be
sure
that
the
to
SUBARU engine
issued 01/2017

Advertisement

Table of Contents
loading

Related Products for NTC RZ120

This manual is also suitable for:

Rz170Rz200Rz120bRz170bRz200bRz120s ... Show all

Table of Contents